flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

Higher Education

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

The building marks the first purpose built structure for cyber studies based at an academy.


By David Malone, Associate Editor | November 17, 2016

Image courtesy SOM / © Smilodon

A new six-story, 206,400-sf building is currently under construction on the U.S. Naval Academy’s campus that will house cyber studies, the computer science department, and other related disciplines.

Hopper Hall, named after Rear Admiral Grace Hopper, is the first academic building named after a woman at a major service academy in the United States and is also the first purpose built facility dedicated to cyber warfare based at an academy.

Skidmore, Owings & Merrill LLP (SOM) is serving as the design lead on Turner Construction’s design-build team. "Our design for Hopper Hall will serve the Naval Academy's mission to equip a new generation of leaders with the knowledge and resources to protect the nation against 21st-century threats," says Roger Duffy, Design Partner at SOM, in a press release.

The building has been designed for a triangular waterfront site that will reinforce the Naval Academy campus’ connection to the waterfront with clear sightlines through the building. Hopper Hall will include classrooms, teaching and research laboratories, offices, multi-purpose space, an observatory, and a research and testing tank. “The Bridge” will be a central hub and gathering space where all activities taking place in the building will converge.

Once complete, Hopper Hall will become the first new academic building built on the Naval Academy’s campus since 1975.

Related Stories

Contractors | Apr 26, 2018

At Boston University’s dental school, ‘under construction’ won’t mean ‘closed for business’

A major renovation and addition are scheduled to minimize operational disruption.

Multifamily Housing | Mar 14, 2018

How to solve the housing crunch on college campuses

A growing number of public and private academic institutions are turning to designers and architects for alternative housing strategies—particularly in high-density areas on the East and West Coasts.

Hotel Facilities | Mar 6, 2018

A New Hampshire college offers student housing as hotel rooms during the summer

The opening of a new residence hall could help with Plymouth State University’s hospitality marketing. 

Higher Education | Dec 11, 2017

Technology and higher ed: The 2030 Challenge

One of the ways in which we are already seeing the use of AR is as an improvement on typical curricula for anatomy in Health Sciences Education.

Engineers | Nov 2, 2017

CannonDesign expands its presence in Colorado with BWG acquisition

Future mergers could be in the offing.

Higher Education | Oct 26, 2017

Where campus meets corporate design

A building is much more than its appearance; it’s how the user will behave inside of it that determines its adaptability.

Adaptive Reuse | Oct 5, 2017

Wexford’s latest innovation center breaks ground in Providence

The campus is expected to include an Aloft hotel. 

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

University Buildings | Sep 5, 2017

Rohrer College of Business supports the schools academic programs with several key spaces

Designed by KSS Architects and Goody Clancy, the new facility opened prior to the fall 2017 school year.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021