flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

Higher Education

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

The building marks the first purpose built structure for cyber studies based at an academy.


By David Malone, Associate Editor | November 17, 2016

Image courtesy SOM / © Smilodon

A new six-story, 206,400-sf building is currently under construction on the U.S. Naval Academy’s campus that will house cyber studies, the computer science department, and other related disciplines.

Hopper Hall, named after Rear Admiral Grace Hopper, is the first academic building named after a woman at a major service academy in the United States and is also the first purpose built facility dedicated to cyber warfare based at an academy.

Skidmore, Owings & Merrill LLP (SOM) is serving as the design lead on Turner Construction’s design-build team. "Our design for Hopper Hall will serve the Naval Academy's mission to equip a new generation of leaders with the knowledge and resources to protect the nation against 21st-century threats," says Roger Duffy, Design Partner at SOM, in a press release.

The building has been designed for a triangular waterfront site that will reinforce the Naval Academy campus’ connection to the waterfront with clear sightlines through the building. Hopper Hall will include classrooms, teaching and research laboratories, offices, multi-purpose space, an observatory, and a research and testing tank. “The Bridge” will be a central hub and gathering space where all activities taking place in the building will converge.

Once complete, Hopper Hall will become the first new academic building built on the Naval Academy’s campus since 1975.

Related Stories

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

Higher Education | Oct 14, 2020

Repurposeability: The future of college campuses

With COVID-19 putting additional pressures on budgets and shutting down or restricting campus access, endless campus expansions are even less tenable.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Higher Education | Aug 26, 2020

Students aren’t the only ones who have returned to Austin College in Texas

KWA Construction built the school’s new residence hall, nearly 10 years after its first student housing project for the college.

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

Coronavirus | Jun 18, 2020

Brown University tops off first housing building in three decades

The facility, scheduled for completion next April, will combine a residence hall with student health services.

Coronavirus | Mar 30, 2020

Learning from covid-19: Campuses are poised to help students be happier

Overcoming isolation isn’t just about the technological face to face, it is about finding meaningful connection and “togetherness”.

Higher Education | Mar 10, 2020

SmithGroup helps Higher Ed clients analyze their space

Its service provides schools with a growth strategy, based on current and future needs.  

Education Facilities | Mar 3, 2020

Carisima Koenig, AIA, joins Perkins Eastman as Associate Higher Education Practice Leader

 Perkins Eastman as Associate Higher Education Practice Leader

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021