A new six-story, 206,400-sf building is currently under construction on the U.S. Naval Academy’s campus that will house cyber studies, the computer science department, and other related disciplines.
Hopper Hall, named after Rear Admiral Grace Hopper, is the first academic building named after a woman at a major service academy in the United States and is also the first purpose built facility dedicated to cyber warfare based at an academy.
Skidmore, Owings & Merrill LLP (SOM) is serving as the design lead on Turner Construction’s design-build team. "Our design for Hopper Hall will serve the Naval Academy's mission to equip a new generation of leaders with the knowledge and resources to protect the nation against 21st-century threats," says Roger Duffy, Design Partner at SOM, in a press release.
The building has been designed for a triangular waterfront site that will reinforce the Naval Academy campus’ connection to the waterfront with clear sightlines through the building. Hopper Hall will include classrooms, teaching and research laboratories, offices, multi-purpose space, an observatory, and a research and testing tank. “The Bridge” will be a central hub and gathering space where all activities taking place in the building will converge.
Once complete, Hopper Hall will become the first new academic building built on the Naval Academy’s campus since 1975.
Related Stories
Resiliency | Jun 24, 2021
Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]
New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.
Higher Education | Jun 21, 2021
Lehigh University expands its burgeoning business college
A new building will provide multiple classrooms, labs, and an incubator.
Digital Twin | May 24, 2021
Digital twin’s value propositions for the built environment, explained
Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.
Architects | Apr 22, 2021
SmithGroup enters partnership to support architecture programs at three Historically Black universities
The firm is providing instructors and mentors as part of a broader effort to expand the industry’s diversity.
Higher Education | Mar 22, 2021
UC Merced’s completed 2020 Project roughly doubles the campus’ physical capacity
Its new buildings are certified LEED Platinum.
Higher Education | Mar 13, 2021
Changing the ivory tower into the real world
Bowling Green’s new Maurer Center reflects a trend toward business-centric learning experiences.
Market Data | Feb 24, 2021
2021 won’t be a growth year for construction spending, says latest JLL forecast
Predicts second-half improvement toward normalization next year.
Higher Education | Jan 25, 2021
Amid pandemic, college students value on-campus experience
All the students we interviewed were glad that they returned to campus in one form or another.
Giants 400 | Dec 16, 2020
Download a PDF of all 2020 Giants 400 Rankings
This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.
AEC Tech | Nov 12, 2020
The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage
BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.