flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New science, old buildings: Renovating for efficiency, flexibility, and connection

Laboratories

New science, old buildings: Renovating for efficiency, flexibility, and connection

Smart renovations of existing spaces can do a lot to increase their efficiency and productivity while turning them into spaces that boost collaboration and attract talent.


By Matthew Plecity, AIA, ASLA, Principal | GBBN | July 3, 2024
People Discussing Robotic Prototype of Hand. Computer Science Education Concept
Photo courtesy Adobe Stock

What does the research space of the future look like? And can it be housed in older buildings (or does it require new construction)?

In a previous article, I laid out a series of concerns that need to be considered when designing for the future of higher education research spaces. On the one hand, I described the close relationship between scientific research and the space in which it takes place, establishing the need for those spaces to evolve to keep up with changing research methods and agendas. This established the need for updated research spaces (if not new ones altogether). On the other hand, I described the difficult financial situation in which many colleges and universities find themselves. Overbuilt and underfunded, they face a growing backlog of deferred maintenance costs and an impending decline in enrollment.

In short, while acknowledging the need to invest in research facilities, I also suggested the wisdom of considering renovations rather than defaulting to new construction. Smart renovations of existing spaces can do a lot to increase their efficiency and productivity while turning them into spaces that boost collaboration and attract talent.

Effective renovations of research spaces offer an opportunity to:

1. Recalibrate existing lab space, increasing efficiency and productivity.

Though I described the accelerating changes in how labs work (from technological changes to the expectation that they provide a healthier, more supportive environment), the fact is that labs have been changing for a long time.

Academic labs, in particular, tend to grow through a long process of accretion. They often slowly expand into empty adjacent spaces or add new instruments wherever they happen to fit. So, rather than fitting new machines into the workflow of an existing space, researchers often end up working around the new machine (wherever it lands). In my experience, researchers are quite inventive in figuring out how to adapt their space to accommodate additional equipment, but that doesn’t necessarily produce the optimal environment for research discoveries.

Thinking in terms of square footages instead of process can result in workspaces that are frustrating, hindering researchers' ability to perform their best work.

A large-scale renovation of a research building offers a good chance to reset. Unlike those small decisions, where furniture and equipment are added here and there, comprehensive renovations allow the design team and user groups to re-envision lab processes, creating more ideal workflows.

Our renovation of Hammerschlag Hall to create a new home for TechSpark—Carnegie Mellon University’s (CMU) largest makerspace—offers a good illustration of this. The century-old building had undergone a patchwork of additions and renovations, resulting in a space that was frequently disorienting and cramped. While expanding makerspaces and machine shops, our renovation created a more open and intuitive floor plan that gave researchers the room they needed to work efficiently, comfortably, and safely. In fact, a study of the renovated space, published in The Journal of the Minerals, Metals & Materials Society reported that, “the rate of research output has increased dramatically” and “the facility is being used extensively for hands-on, graduate-level instruction.”

2. Prioritize flexibility, build in adaptability.

With the current pace of innovation, flexibility is more critical than ever. By way of illustration, we recently designed an additives lab for CMU at Mill 19—a state of the art, off-campus facility housed within the remains of a former steel mill—and we had to update the equipment order several times before the lab was even built. It wasn’t a long project, but the pace of technological change is just that quick!

This is characteristic of the changes that are affecting research across the board. From the ever-expanding capacity of rapid prototyping equipment to increasingly networked and automated research processes, the infrastructure of research is quickly changing. This makes it essential that renovations take pains to create a space that can accommodate changes in the way we work.

Labs for rotating research teams
Image courtesy GBBN

Thus, we find ourselves designing for flexibility. Whether we’re designing labs for rotating research teams in new buildings like University of Cincinnati’s (UC) Digital Futures or renovating spaces in the 1200 Wing of CMU’s Hammerschlag Hall, we are not building a lot of highly specialized equipment into lab space. Instead, we’re using adaptable, modular design elements and features, like regularly-spaced, drop-down power lines to enable researchers to easily reconfigure their space as their needs change.

3. Reconfigure research spaces for connectivity.

Historically, the design of research buildings contributed to the tendency of the sciences to become siloed. From the early 20th Century to the Brutalist designs of the 1950s and 1960s, these buildings were designed to usher researchers to their labs. It was assumed researchers would go directly to their bench and stay put. There was little connection between spaces, few interior windows, and few opportunities to share (or even glimpse what others were working on). As interdisciplinary research has gained more currency—and socialization and relaxation have become understood as valuable, not just to humans but also to the research process—there is increasing demand for research buildings to foster connection.

These are table stakes in new research spaces. Thus, our design of UC’s Digital Futures building uses glass-lined lab spaces, research galleries, and shared resources (makerspaces, meeting rooms, VR Labs, and social spaces) to encourage conversation between researchers. And our study of CMU’s Science Futures Building called for the inclusion of science-adjacent programs, like an art gallery and colocation with the School of Computer Science, to encourage connection.

But opportunities to enrich research through social connection can also be created in existing buildings. In our renovation of the 8000-level of CMU’s Wean Hall, for instance, we’re blowing out windowless, concrete block walls and replacing them with glass partitions. This not only creates spaces that flow into one another, but it is transforming a wing where nothing was visible into a place to see and be seen. Shared breakout spaces complement this effort, helping researchers to connect.

As automated processes, AI, and the scientific internet of things transform lab work, enabling increased hybrid work arrangements, shared spaces outside the lab will become more important for socializing and working while enjoying easy access to the lab.

More from Author

GBBN | Jun 3, 2024

Insights for working well in a hybrid world

GBBN Principal and Interior Designer Beth Latto, NCIDQ, LEED AP, ID+C, WELL AP, share a few takeaways, insights, and lessons learned from a recent Post Occupancy Evaluation of the firm's Cincinnati, Ohio, office.

GBBN | Feb 26, 2024

GBBN's Inflation Reduction Act Calculator goes live

GBBN has publicly released its IRA Calculator, a tool that helps you understand funding opportunities in the IRA for sustainable design.

GBBN | Jan 25, 2024

Tactical issues for renovating university research buildings

Matthew Plecity, AIA, ASLA, Principal, GBBN, highlights the connection between the built environment and laboratory research, and weighs the benefits of renovation vs. new construction.

GBBN | Dec 14, 2023

What's next for affordable housing in 2024?

As 2023 draws to a close, GBBN’s Mary Jo Minerich and Amanda Markovic, AIA sat down to talk about the future. What’s next in terms of trends, technology, and construction of affordable housing?

GBBN | Oct 11, 2023

Leveraging land and light to enhance patient care

GBBN interior designer Kristin Greeley shares insights from the firm's latest project: a cancer center in Santa Fe, N.M.

GBBN | Aug 31, 2023

Small town takes over big box

GBBN associate Claire Shafer, AIA, breaks down the firm's recreational adaptive reuse project for a small Indiana town.

GBBN | Jun 20, 2023

Designing arts spaces that curate inclusivity

GBBN's Julia Clements and Marcene Kinney, AIA, LEED AP, talk tips for designing inclusive arts spaces.

GBBN | Mar 22, 2023

Onsite prefabrication for healthcare construction: It's more than a process, it's a partnership

Prefabrication can help project teams navigate an uncertain market. GBBN's Mickey LeRoy, AIA, ACHA, LEED AP, explains the difference between onsite and offsite prefabrication methods for healthcare construction projects.

GBBN | Mar 8, 2023

Is Zoom zapping your zip? Here are two strategies to help creative teams do their best work

Collaborating virtually requires a person to filter out the periphery of their field of vision and focus on the glow of the screen. Zoom fatigue is a well-documented result of our over-reliance on one method of communication to work. We need time for focus work but working in isolation limits creative outcomes and innovations that come from in-person collaboration, write GBBN's Eric Puryear, AIA, and Mandy Woltjer.

GBBN | Jan 12, 2023

Invest in existing buildings for your university

According to Nick Sillies of GBBN, students are increasingly asking: "How sustainable is your institution?" Reusing existing buildings may help answer that.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021