flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

Higher Education

Construction begins on the U.S. Naval Academy’s new cyber studies and computer science department building, Hopper Hall

The building marks the first purpose built structure for cyber studies based at an academy.


By David Malone, Associate Editor | November 17, 2016

Image courtesy SOM / © Smilodon

A new six-story, 206,400-sf building is currently under construction on the U.S. Naval Academy’s campus that will house cyber studies, the computer science department, and other related disciplines.

Hopper Hall, named after Rear Admiral Grace Hopper, is the first academic building named after a woman at a major service academy in the United States and is also the first purpose built facility dedicated to cyber warfare based at an academy.

Skidmore, Owings & Merrill LLP (SOM) is serving as the design lead on Turner Construction’s design-build team. "Our design for Hopper Hall will serve the Naval Academy's mission to equip a new generation of leaders with the knowledge and resources to protect the nation against 21st-century threats," says Roger Duffy, Design Partner at SOM, in a press release.

The building has been designed for a triangular waterfront site that will reinforce the Naval Academy campus’ connection to the waterfront with clear sightlines through the building. Hopper Hall will include classrooms, teaching and research laboratories, offices, multi-purpose space, an observatory, and a research and testing tank. “The Bridge” will be a central hub and gathering space where all activities taking place in the building will converge.

Once complete, Hopper Hall will become the first new academic building built on the Naval Academy’s campus since 1975.

Related Stories

Higher Education | Jun 7, 2017

Building for the future: Five trends in higher education projects

Preparing students for life after graduation has become the primary motivator behind construction initiatives at U.S. colleges and universities.

Higher Education | Jun 6, 2017

Funding remains a concern, but not always an impediment

Colleges and universities are adept at tapping a variety of sources—taxpayers, investors, donors, and, yes, students—to fund their growth ambitions.

Higher Education | May 31, 2017

Space utilization in higher education: more than sf per student

There’s more to space utilization than how often a room is occupied. What happens inside an occupied room is just as important.

Reconstruction & Renovation | May 30, 2017

Achieving deep energy retrofits in historic and modern-era buildings [AIA course]

Success in retrofit projects requires an entirely different mindset than in new construction, writes Randolph Croxton, FAIA, LEED AP, President of Croxton Collaborative Architects. 

Libraries | May 16, 2017

A New York-area community college adds new zest to its library

Wired seating and group work areas abound.   

University Buildings | Apr 28, 2017

Suburban Chicago college breaks ground on aviation-themed student center

The design of the center is meant to pay tribute to the university’s heritage in aviation and aeronautics.

University Buildings | Apr 26, 2017

UMass Amherst is home to America’s first CLT academic building

The building brings the architecture, landscape architecture, and building technology departments under one roof.

Higher Education | Apr 24, 2017

Small colleges face challenges — and opportunities

Moody’s Investor Service forecasts that closure rates for small institutions will triple in the coming years, and mergers will double.

University Buildings | Mar 8, 2017

Massive mixed-use residential village on USC’s Los Angeles campus on schedule to open this fall

Prefabrication of the six buildings’ walls reduced construction time by a year. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021