BD+C: You’re a second-generation contractor, aren’t you?
Sundra L. Ryce: My dad is 66, and he’s owned W.C. Roberson Plumbing and Construction Corp. here in Buffalo for over 30 years. I started working for him as a teenager, learning basic business practices, especially about integrity. He taught me that if you say you’re going to do something, do it. He also had a very diverse company, and that has translated into our business. He’s my number one mentor.
BD+C: Right from the start, in 1996, you made a conscious decision to go into the commercial sector. Why?
SLR: I had a vision of growth, and I wanted to position the company to become a medium-size or larger firm. That’s the path we’ve taken. To date, our largest project, which is in excess of $16 million, is with the New York State Power Authority. So we are fulfilling our vision.
BD+C: How’s business?
SLR: We employ about 30 people, with revenues expected to exceed more than $25 million this year. About 10-15% of our work is CM, 20% is design-build, but our mainstay is general construction. We’ve been doing work for the Federal government for the last 12 years. We have worked with the Army Corps of Engineers, building their Military Entrance Processing Station at the Niagara Falls Air Reserve Station, and, more recently, a renovation project for the Navy, in Erie, Pa. As far as design-build work goes, we see the Federal government moving more into that arena as well. They want you to bring the team to them and deliver the whole project—one-stop shopping.
BD+C: Your firm qualifies doubly as an MWBE, a business owned by a minority member or woman. Which is better for business, the M or the W?
SLR: The M helps me more, because in a lot of the projects, with the hiring goals that are set, there’s a greater capacity for minorities; for example, it may be 25% minority-owned, vs. 7% for woman-owned. Do I use it? Yes, especially for bidding on the larger projects. Fortunately, we have earned an excellent reputation for providing exceptional general construction services over the years. That is what we lead with when presenting ourselves, while highlighting that we are an MWBE after that.
BD+C: Your company is part of a consortium that’s doing $1 billion of work for the Buffalo Public Schools. What have you learned from that experience?
SLR: When you’re working with government entities, it’s really important to have a highly trained team with the skill sets to deal with the bureaucracy on all levels. Most agencies are meticulous about their paperwork, and that has been a stumbling block for many small or medium-size firms. At SLR Contracting, we quickly learned how to satisfy those requirements by providing all the appropriate documents necessary to complete those kinds of projects.
BD+C: During a recent radio interview you said you thought you were seeing light at the end of the economic tunnel. Enlighten us!
SLR: One of the things that has given us hope as a company is that in western New York, we are seeing projects come back to life. In Buffalo, the city is redeveloping the Erie Canal and the harbor, a $75 million project. And when you talk to the bankers, and looking at business trends, there is a small amount of growth. It’s a light, not a total recovery.
BD+C: You participated in a public forum in which you asked a question of President Obama. What did you ask him?
SLR: My question was about how to successfully run a small business. I specifically asked about the education programs offered to small business owners and how they should effectively negotiate contracts. I wanted to know what his administration is doing to implement new educational practices which support small business enterprises.
BD+C: And what did he say?
SLR: He answered for eight minutes. [Laughs.] He said they are looking at going into colleges and high schools to implement programs for entrepreneurial degrees, so that when people get to the point where they’re able to start a business, they have the tools.
BD+C: Are you feeling pressure from larger firms coming into your turf?
SLR: It’s kind of flipped around for us. Because of our growth, we’re moving into other markets, and it’s been a surprise to some businesses in those areas. For example, with the Erie Canal Harbor Development project, a larger firm [Hunt Construction] actually asked us to partner with them, and it’s been a great relationship for both of us.
BD+C: What’s your toughest challenge?
SLR: Balancing the opportunities that come to us. Once you get a name as a good contractor, you have to be really selective, to be fiscally responsible, to deliver those projects, get rave reviews and repeat customers. You’d love to take all the jobs, but you can’t. We want to grow smart instead of just growing fast.
Related Stories
| Nov 29, 2010
Data Centers: Keeping Energy, Security in Check
Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation’s largest commercial user of electric power. Major technology companies, notably Hewlett-Packard, Cisco Systems, and International Business Machines, are investing heavily in new data centers. HP, which acquired technology services provider EDS in 2008, announced in June that it would be closing many of its older data centers and would be building new, more highly optimized centers around the world.
| Nov 29, 2010
New Design Concepts for Elementary and Secondary Schools
Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.
| Nov 29, 2010
Renovating for Sustainability
Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.
| Nov 23, 2010
The George W. Bush Presidential Center, which will house the former president’s library
The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.
| Nov 23, 2010
Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy
Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.
| Nov 16, 2010
Architecture Billings Index: inquiries for new projects remain extremely high
The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.
| Nov 16, 2010
Brazil Olympics spurring green construction
Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.
| Nov 16, 2010
Green building market grows 50% in two years; Green Outlook 2011 report
The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.