flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thought Leader

Thought Leader

Sundra L. Ryce is president and CEO of SLR Contracting & Service Company, Inc., Buffalo, N.Y., a general construction company that she founded in 1996. Her firm specializes in commercial work, including new construction, renovation projects, construction management, and design-build services. She received a BS in business studies from the State University of New York College at Buffalo and an MS in education from Medaille College, Buffalo. Ryce, an ordained minister and professional speaker, is a trustee of the Buffalo Niagara Partnership, Great Lakes Health, Buffalo Urban Development Corporation, and the Buffalo Society of Natural Sciences.


By By Robert Cassidy, Editorial Director | October 13, 2010
This article first appeared in the October 2010 issue of BD+C.

BD+C: You’re a second-generation contractor, aren’t you?

Sundra L. Ryce: My dad is 66, and he’s owned W.C. Roberson Plumbing and Construction Corp. here in Buffalo for over 30 years. I started working for him as a teenager, learning basic business practices, especially about integrity. He taught me that if you say you’re going to do something, do it. He also had a very diverse company, and that has translated into our business. He’s my number one mentor.

BD+C: Right from the start, in 1996, you made a conscious decision to go into the commercial sector. Why?

SLR: I had a vision of growth, and I wanted to position the company to become a medium-size or larger firm. That’s the path we’ve taken. To date, our largest project, which is in excess of $16 million, is with the New York State Power Authority. So we are fulfilling our vision.

BD+C: How’s business?

SLR: We employ about 30 people, with revenues expected to exceed more than $25 million this year. About 10-15% of our work is CM, 20% is design-build, but our mainstay is general construction. We’ve been doing work for the Federal government for the last 12 years. We have worked with the Army Corps of Engineers, building their Military Entrance Processing Station at the Niagara Falls Air Reserve Station, and, more recently, a renovation project for the Navy, in Erie, Pa. As far as design-build work goes, we see the Federal government moving more into that arena as well. They want you to bring the team to them and deliver the whole project—one-stop shopping.

BD+C: Your firm qualifies doubly as an MWBE, a business owned by a minority member or woman. Which is better for business, the M or the W?

SLR: The M helps me more, because in a lot of the projects, with the hiring goals that are set, there’s a greater capacity for minorities; for example, it may be 25% minority-owned, vs. 7% for woman-owned. Do I use it? Yes, especially for bidding on the larger projects. Fortunately, we have earned an excellent reputation for providing exceptional general construction services over the years. That is what we lead with when presenting ourselves, while highlighting that we are an MWBE after that.

BD+C: Your company is part of a consortium that’s doing $1 billion of work for the Buffalo Public Schools. What have you learned from that experience?

SLR: When you’re working with government entities, it’s really important to have a highly trained team with the skill sets to deal with the bureaucracy on all levels. Most agencies are meticulous about their paperwork, and that has been a stumbling block for many small or medium-size firms. At SLR Contracting, we quickly learned how to satisfy those requirements by providing all the appropriate documents necessary to complete those kinds of projects.

BD+C: During a recent radio interview you said you thought you were seeing light at the end of the economic tunnel. Enlighten us!

SLR: One of the things that has given us hope as a company is that in western New York, we are seeing projects come back to life. In Buffalo, the city is redeveloping the Erie Canal and the harbor, a $75 million project. And when you talk to the bankers, and looking at business trends, there is a small amount of growth. It’s a light, not a total recovery.

BD+C: You participated in a public forum in which you asked a question of President Obama. What did you ask him?

SLR: My question was about how to successfully run a small business. I specifically asked about the education programs offered to small business owners and how they should effectively negotiate contracts. I wanted to know what his administration is doing to implement new educational practices which support small business enterprises.

BD+C: And what did he say?

SLR: He answered for eight minutes. [Laughs.] He said they are looking at going into colleges and high schools to implement programs for entrepreneurial degrees, so that when people get to the point where they’re able to start a business, they have the tools.

BD+C: Are you feeling pressure from larger firms coming into your turf?

SLR: It’s kind of flipped around for us. Because of our growth, we’re moving into other markets, and it’s been a surprise to some businesses in those areas. For example, with the Erie Canal Harbor Development project, a larger firm [Hunt Construction] actually asked us to partner with them, and it’s been a great relationship for both of us.

BD+C: What’s your toughest challenge?

SLR: Balancing the opportunities that come to us. Once you get a name as a good contractor, you have to be really selective, to be fiscally responsible, to deliver those projects, get rave reviews and repeat customers. You’d love to take all the jobs, but you can’t. We want to grow smart instead of just growing fast.

Related Stories

| Dec 7, 2010

Green building thrives in shaky economy

Green building’s momentum hasn’t been stopped by the economic recession and will keep speeding through the recovery, while at the same time building owners are looking to go green more for economic reasons than environmental ones. Green building has grown 50% in the past two years; total construction starts have shrunk 26% over the same time period, according to “Green Outlook 2011” report. The green-building sector is expected to nearly triple by 2015, representing as much as $145 billion in new construction activity.

| Dec 7, 2010

USGBC: Wood-certification benchmarks fail to pass

The proposed Forest Certification Benchmark to determine when wood-certification groups would have their certification qualify for points in the LEED rating systemdid not pass the USGBC member ballot. As a result, the Certified Wood credit in LEED will remain as it is currently written. To date, only wood certified by the Forest Stewardship Council qualifies for a point in the LEED, while other organizations, such as the Sustainable Forestry Initiative, the Canadian Standards Association, and the American Tree Farm System, are excluded.

| Dec 7, 2010

Prospects for multifamily sector improve greatly

The multifamily sector is showing signs of a real recovery, with nearly 22,000 new apartment units delivered to the market. Net absorption in the third quarter surged by 94,000 units, dropping the national vacancy rate from 7.8% to 7.1%, one of the largest quarterly drops on record, and rents increased for the second quarter in a row.

| Dec 7, 2010

Hot rumor: Norman Foster designing Apple’s new campus

Lord Norman Foster, reportedly has been selected to design Apple’s new campus in Cupertino, Calif. If the news is true, Foster is a good match for Apple say experts. Foster built his celebrity by marrying big gestures to technological wizardry. And, unlike some starchitects, he has glommed onto the environmental revolution—something Apple has made a point of embracing, too.

| Dec 7, 2010

10 megacities of the near future

With Beijing, Shanghai, and Mumbai already on the global radar, where can the next wave of construction be found? Far beyond China, India, and even Brazil it’s predicted. The world’s next future megacities could include Istanbul, Turkey; Ho Chi Minh City, Vietnam; and Khartoum, Sudan, among others. Read about these emerging and little-known behemoths.

| Dec 7, 2010

Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices

IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.

| Dec 6, 2010

Honeywell survey

Rising energy costs and a tough economic climate have forced the nation’s school districts to defer facility maintenance and delay construction projects, but they have also encouraged districts to pursue green initiatives, according to Honeywell’s second annual “School Energy and Environment Survey.”

| Dec 2, 2010

GKV Architects wins best guest room design award for Park Hyatt Istanbul

Gerner Kronick + Valcarcel, Architects, PC won the prestigious Gold Key Award for Excellence in Hospitality Design for best guest room, Park Hyatt Macka Palas, Istanbul, Turkey. Park Hyatt Maçka Palace marries historic and exotic elements with modern and luxurious, creating a unique space perpetuating Istanbul’s current culture. In addition to the façade restoration, GKV Architects designed 85  guestrooms, five penthouse suites, an ultra-hip rooftop bar, and a first-of-its-kind for Istanbul – a steakhouse, for the luxury  hotel.

| Dec 2, 2010

U.S Energy Secretary Chu announces $21 Million to improve energy use in commercial buildings

U.S. Energy Secretary Steven Chu announced that 24 projects are receiving a total of $21 million in technical assistance to dramatically reduce the energy used in their commercial buildings. This initiative will connect commercial building owners and operators with multidisciplinary teams including researchers at DOE's National Laboratories and private sector building experts. The teams will design, construct, measure, and test low-energy building plans, and will help accelerate the deployment of cost-effective energy-saving measures in commercial buildings across the United States.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021