flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Thought Leader

Thought Leader

Sundra L. Ryce is president and CEO of SLR Contracting & Service Company, Inc., Buffalo, N.Y., a general construction company that she founded in 1996. Her firm specializes in commercial work, including new construction, renovation projects, construction management, and design-build services. She received a BS in business studies from the State University of New York College at Buffalo and an MS in education from Medaille College, Buffalo. Ryce, an ordained minister and professional speaker, is a trustee of the Buffalo Niagara Partnership, Great Lakes Health, Buffalo Urban Development Corporation, and the Buffalo Society of Natural Sciences.


By By Robert Cassidy, Editorial Director | October 13, 2010
This article first appeared in the October 2010 issue of BD+C.

BD+C: You’re a second-generation contractor, aren’t you?

Sundra L. Ryce: My dad is 66, and he’s owned W.C. Roberson Plumbing and Construction Corp. here in Buffalo for over 30 years. I started working for him as a teenager, learning basic business practices, especially about integrity. He taught me that if you say you’re going to do something, do it. He also had a very diverse company, and that has translated into our business. He’s my number one mentor.

BD+C: Right from the start, in 1996, you made a conscious decision to go into the commercial sector. Why?

SLR: I had a vision of growth, and I wanted to position the company to become a medium-size or larger firm. That’s the path we’ve taken. To date, our largest project, which is in excess of $16 million, is with the New York State Power Authority. So we are fulfilling our vision.

BD+C: How’s business?

SLR: We employ about 30 people, with revenues expected to exceed more than $25 million this year. About 10-15% of our work is CM, 20% is design-build, but our mainstay is general construction. We’ve been doing work for the Federal government for the last 12 years. We have worked with the Army Corps of Engineers, building their Military Entrance Processing Station at the Niagara Falls Air Reserve Station, and, more recently, a renovation project for the Navy, in Erie, Pa. As far as design-build work goes, we see the Federal government moving more into that arena as well. They want you to bring the team to them and deliver the whole project—one-stop shopping.

BD+C: Your firm qualifies doubly as an MWBE, a business owned by a minority member or woman. Which is better for business, the M or the W?

SLR: The M helps me more, because in a lot of the projects, with the hiring goals that are set, there’s a greater capacity for minorities; for example, it may be 25% minority-owned, vs. 7% for woman-owned. Do I use it? Yes, especially for bidding on the larger projects. Fortunately, we have earned an excellent reputation for providing exceptional general construction services over the years. That is what we lead with when presenting ourselves, while highlighting that we are an MWBE after that.

BD+C: Your company is part of a consortium that’s doing $1 billion of work for the Buffalo Public Schools. What have you learned from that experience?

SLR: When you’re working with government entities, it’s really important to have a highly trained team with the skill sets to deal with the bureaucracy on all levels. Most agencies are meticulous about their paperwork, and that has been a stumbling block for many small or medium-size firms. At SLR Contracting, we quickly learned how to satisfy those requirements by providing all the appropriate documents necessary to complete those kinds of projects.

BD+C: During a recent radio interview you said you thought you were seeing light at the end of the economic tunnel. Enlighten us!

SLR: One of the things that has given us hope as a company is that in western New York, we are seeing projects come back to life. In Buffalo, the city is redeveloping the Erie Canal and the harbor, a $75 million project. And when you talk to the bankers, and looking at business trends, there is a small amount of growth. It’s a light, not a total recovery.

BD+C: You participated in a public forum in which you asked a question of President Obama. What did you ask him?

SLR: My question was about how to successfully run a small business. I specifically asked about the education programs offered to small business owners and how they should effectively negotiate contracts. I wanted to know what his administration is doing to implement new educational practices which support small business enterprises.

BD+C: And what did he say?

SLR: He answered for eight minutes. [Laughs.] He said they are looking at going into colleges and high schools to implement programs for entrepreneurial degrees, so that when people get to the point where they’re able to start a business, they have the tools.

BD+C: Are you feeling pressure from larger firms coming into your turf?

SLR: It’s kind of flipped around for us. Because of our growth, we’re moving into other markets, and it’s been a surprise to some businesses in those areas. For example, with the Erie Canal Harbor Development project, a larger firm [Hunt Construction] actually asked us to partner with them, and it’s been a great relationship for both of us.

BD+C: What’s your toughest challenge?

SLR: Balancing the opportunities that come to us. Once you get a name as a good contractor, you have to be really selective, to be fiscally responsible, to deliver those projects, get rave reviews and repeat customers. You’d love to take all the jobs, but you can’t. We want to grow smart instead of just growing fast.

Related Stories

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021