flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Codes and Standards

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.


By Peter Fabris, Contributing Editor | April 24, 2017

PIxabay Public Domain

A new report released by the Center for an Urban Future found significant flaws in how New York City manages capital projects for libraries and cultural institutions.

These projects encounter “staggering delays and exorbitant costs” the report says. The median new library and cultural project takes about seven years to complete and costs $930 per square foot, or roughly twice the cost of building a new office tower in the city, the report says.

The report, a joint project with the Citizens Budget Commission, analyzed 144 capital projects for libraries and cultural organizations completed between fiscal years 2010 and 2014. All were managed by the city’s Department of Design and Construction (DDC).

The report found that even seemingly routine maintenance projects end up taking years. For instance, the median mechanical system upgrade—including replacement and installation of fire alarms, boilers, and heating/cooling systems—took 4.3 years to complete. The study also found that when institutions are granted permission to self-manage capital projects, which is allowed on rare occasions, the projects typically take a fraction of the time and cost roughly 40% less.

Related Stories

Codes and Standards | Aug 16, 2017

Big changes coming to Ontario building code

Proposals include solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.

Codes and Standards | Aug 14, 2017

New edition of AISC Steel Construction Manual now available

Includes the 2016 Specification for Structural Steel Buildings.

Codes and Standards | Aug 10, 2017

AAMA releases updated Standard Test Method for Water Penetration Using Dynamic Pressure

The update applies to windows, curtain walls, and doors.

Codes and Standards | Aug 9, 2017

UpCodes aims to make researching building codes, regulations easier through searchable app

App currently includes building codes of 40 states and New York City.

Codes and Standards | Aug 8, 2017

3D printing industry working to implement standards for products, processes

Additive Manufacturing Standardization Collective (AMSC) will develop industry-wide additive manufacturing standards and specifications.

Codes and Standards | Aug 7, 2017

Council on Tall Buildings and Urban Habitat to create standards to measure floor area

The standards will examine existing codes and regulations to find where they are too broad or contentious.

Codes and Standards | Aug 3, 2017

ASID headquarters is first space in the world to earn both LEED and WELL Platinum Certification

Washington, D.C. office is showcase for top levels of the two standards.

Codes and Standards | Aug 2, 2017

OSHA to release web-based injury and illness reporting form on August 1st

Employers can use the application to submit forms electronically.

Codes and Standards | Aug 1, 2017

Zoning that restricts housing construction also dampens other economic development

Land use restrictions reduce U.S. GDP by 9% annually.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021