flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Richard Meier unveils design scheme for residential high-rise in Taipei

Multifamily Housing

Richard Meier unveils design scheme for residential high-rise in Taipei

The sleek and minimalist luxury tower will offer guests and residents views of the iconic Taipei 101.


By Adilla Menayang, Assistant Digital Editor | September 23, 2015
Richard Meier & Partners unveil Taipei residential high-rise design

The tower’s plaza is entirely dedicated for public use. Renderings by Vize, courtesy Richard Meier & Partners

Juxtaposed against the super-tall pagoda-like Taipei 101 tower, Richard Meier & Partners designed a sleek and slim residential high-rise commissioned by Continental Development Corporation, designboom reports.

Officially titled the CDC 55 Timeless Xin-Yi tower, the building will rise to a total height of 417 feet, standing atop a public field and plaza, dubbed to be a new precedent in Taiwan where a private building dedicates its entire landscape to the public.

With configurations that range from two apartments per floor to one large apartment unit per story, the development is targeted at high-end buyers. Luxury amenities include an outdoor swimming pool and roof deck offering views of the city’s landmark Taipei 101 and the rest of the skyline.

According to designboom, the building’s horizontal and vertical organization is “based on a strong geometric clarity.”

“The relationship between these two main elements is emphasized through a subtle shift in both plan and elevation, creating a dynamism and variation in scale that responds to the immediate urban environment,” the architects explain. “The solid north volume contains the core of the residential units that flows toward the transparent south volume, which is a natural-light-filled space where living, social, and the more public programs are located. A carefully crafted geometric organization allows viewing corridors towards the mountains in the far distance.”

Construction is under way, and is scheduled to be completed in 2017.

 

Related Stories

Coronavirus | Apr 5, 2020

COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.

Plumbing | Mar 13, 2020

Pioneer Industries launches new website

Pioneer Industries launches new website

Multifamily Housing | Mar 5, 2020

The Aviator apartment community opens near Henderson Executive Airport

The community is inspired by antique airplane designs.

Building Materials | Mar 3, 2020

84 Lumber President Maggie Hardy Knox receives Career Achievement Award

Maggie Hardy Knox, President of 84 Lumber and Nemacolin Woodlands Resort, to receive Career Achievement Award.

Multifamily Housing | Feb 26, 2020

School districts in California are stepping in to provide affordable housing for faculty and staff

One high school district in Daly City has broken ground on 122-apartment building.

Multifamily Housing | Feb 23, 2020

A post-storm Puerto Rico reconsiders how and what to rebuild

Federal help means tougher code enforcement. And will this island of homeowners embrace renting?

| Feb 17, 2020

Interior designers weigh in on outdoor kitchens

Designers weigh in on outdoor kitchens

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021