flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Sponsored Content Flooring

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Construction delays are common with projects as large as the $354 million Reading Hospital expansion. Maybe that’s why construction manager Jeff Hutwelker, project executive with LF Driscoll Co., LLC, was so pleased with his nora® experience. By Hutwelker’s estimates, nora nTx saved approximately two months in his construction schedule.


By nora | December 7, 2016

When Reading Hospital embarked on a 476,000-square-foot addition to its West Reading, Pennsylvania, location, the goal was to replace and relocate operating rooms spread across four buildings and provide 150 new private patient rooms. The nine-story tower that opened in October includes five floors of private patient rooms, 24 surgical suites, eight minor procedure rooms, reception and recovery areas and an expanded trauma unit. Most of the new facility features noraplan® eco floor covering with nora nTx.

nora nTx is a pre-applied, solvent-free adhesive backing that minimizes prep work and eliminates drying protocols, saving valuable time and money. The product is resistant to high moisture vapor emissions and has no pH limits, eliminating the need for moisture testing and remediation before installation.

According to Hutwelker, the application of nora nTx provided two advantages during construction. “It did not require a moisture mitigation system, which represents a savings in not only dollars, but also in time—two months in our construction schedule. Secondly, we had one company providing all the warranty for the flooring, which is pretty much unheard of in other projects. One warranty from one supplier is very helpful.”

 

 

Others involved in the project pointed to additional advantages nora flooring offers. David Major, the hospital’s director of facilities and construction, says “Maintenance of the product is greatly enhanced. We don’t have to unwax or wax the floors.”

Tim Cole, director of environmental services, agrees. “The floor offers as much as 20 to 30 percent in labor savings related to the care and maintenance of the floor. In addition, from an environmental standpoint, you can clean and maintain the floor with less caustic chemicals and cleaners as opposed to other traditional floor coverings.”

The floor’s simple maintenance regimen is also expected to improve patient throughput. Says Cole, “With nora flooring, we can turn over patient rooms very quickly—probably in half the time it would take to do a floor we have to clean and wax.” And he appreciates the floor’s low-gloss finish, which helps older patients sometimes disoriented by shiny floors.

Meanwhile, Marie Keim, Reading Health System’s director of epidemiology infection and prevention, applauds the floor’s contribution to infection prevention. “The surfaces are smooth; we don’t need to be concerned about residual water, bacteria and other items going into cracks and crevices and harboring any sort of bacteria or organisms. The other positive aspect of the nora flooring is that it resists staining...and the floor makes it much easier to stand throughout our day as we provide services to our patients.”

Comfort underfoot, stain and slip resistance, a simple maintenance regimen, improved indoor air quality and construction time and cost savings—together, these benefits support the hospital’s decision to install nora rubber flooring with nora nTx throughout its new tower.

 

nora systems, Inc. 
Phone: 1-800-332-NORA
Fax: (603) 894-6615
Email: info-us@nora.com
Website: www.nora.com/us

Related Stories

75 Top Building Products | Nov 30, 2022

75 top building products for 2022

Each year, the Building Design+Construction editorial team evaluates the vast universe of new and updated products, materials, and systems for the U.S. building design and construction market. The best-of-the-best products make up our annual 75 Top Products report. 

Multifamily Housing | Sep 13, 2022

Take the Multifamily Kitchen + Bath survey – Maybe win one of 10 $50 gift cards

Preliminary results of 2022 Multifamily Design+Construction exclusive Kitchen + Bath survey.

Building Materials | Aug 3, 2022

Shawmut CEO Les Hiscoe on coping with a shaky supply chain in construction

BD+C's John Caulfield interviews Les Hiscoe, CEO of Shawmut Design and Construction, about how his firm keeps projects on schedule and budget in the face of shortages, delays, and price volatility.

Codes and Standards | Jun 2, 2022

New design guide for hybrid steel-mass timber frames released

The American Institute of Steel Construction (AISC) has released the first-ever set of U.S. recommendations for hybrid steel frames with mass timber floors, according to a news release.

Products and Materials | Feb 24, 2022

MAXXON® Corporation announces strategic affiliation with S3 Surface Solutions

Maxxon® Corporation, creator of Gyp-Crete® and a leader in the underlayment industry for 50 years, has aligned with S3 Surface Solutions, an innovative manufacturer of products that address problematic concrete slabs, to bring innovative, technology-driven subfloor preparation solutions to the flooring industry.

75 Top Building Products | Dec 16, 2019

Top Flooring Products for 2019

Tarkett’s aviation-inspired flooring collection and J+J Flooring’s textile composite flooring are among the four new commercial flooring products to make Building Design+Construction’​s 2019 101 Top Products report. 

Sponsored | Flooring | Jun 25, 2018

Traditional installation methods challenged by GC and subcontractor

Time and money are both precious and often too easily compromised on construction projects. This study proves how on one Boston high rise residential tower, correcting unanticipated out-of-spec concrete deflection was solved in 50% less time at 30% less cost. 

Flooring | Jun 21, 2018

Product roundup: Floor and wall tile collection

Project evolution from Ceramiche Caesar, Eminent Wood Maximum from Fiandre, and Voyage from Landmark are just three of the 12 products highlighted in BD+C's June Product Roundup.

75 Top Building Products | Mar 22, 2018

101 Top Products: Flooring 2018

Among the best flooring products included in BD+C's Top 101 Products report are Bostik's 'Climb' Low-VOC Adhesive and Schulter Systems Ditra Heat Duo Membrane.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021