flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Sponsored Content Flooring

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Construction delays are common with projects as large as the $354 million Reading Hospital expansion. Maybe that’s why construction manager Jeff Hutwelker, project executive with LF Driscoll Co., LLC, was so pleased with his nora® experience. By Hutwelker’s estimates, nora nTx saved approximately two months in his construction schedule.


By nora | December 7, 2016

When Reading Hospital embarked on a 476,000-square-foot addition to its West Reading, Pennsylvania, location, the goal was to replace and relocate operating rooms spread across four buildings and provide 150 new private patient rooms. The nine-story tower that opened in October includes five floors of private patient rooms, 24 surgical suites, eight minor procedure rooms, reception and recovery areas and an expanded trauma unit. Most of the new facility features noraplan® eco floor covering with nora nTx.

nora nTx is a pre-applied, solvent-free adhesive backing that minimizes prep work and eliminates drying protocols, saving valuable time and money. The product is resistant to high moisture vapor emissions and has no pH limits, eliminating the need for moisture testing and remediation before installation.

According to Hutwelker, the application of nora nTx provided two advantages during construction. “It did not require a moisture mitigation system, which represents a savings in not only dollars, but also in time—two months in our construction schedule. Secondly, we had one company providing all the warranty for the flooring, which is pretty much unheard of in other projects. One warranty from one supplier is very helpful.”

 

 

Others involved in the project pointed to additional advantages nora flooring offers. David Major, the hospital’s director of facilities and construction, says “Maintenance of the product is greatly enhanced. We don’t have to unwax or wax the floors.”

Tim Cole, director of environmental services, agrees. “The floor offers as much as 20 to 30 percent in labor savings related to the care and maintenance of the floor. In addition, from an environmental standpoint, you can clean and maintain the floor with less caustic chemicals and cleaners as opposed to other traditional floor coverings.”

The floor’s simple maintenance regimen is also expected to improve patient throughput. Says Cole, “With nora flooring, we can turn over patient rooms very quickly—probably in half the time it would take to do a floor we have to clean and wax.” And he appreciates the floor’s low-gloss finish, which helps older patients sometimes disoriented by shiny floors.

Meanwhile, Marie Keim, Reading Health System’s director of epidemiology infection and prevention, applauds the floor’s contribution to infection prevention. “The surfaces are smooth; we don’t need to be concerned about residual water, bacteria and other items going into cracks and crevices and harboring any sort of bacteria or organisms. The other positive aspect of the nora flooring is that it resists staining...and the floor makes it much easier to stand throughout our day as we provide services to our patients.”

Comfort underfoot, stain and slip resistance, a simple maintenance regimen, improved indoor air quality and construction time and cost savings—together, these benefits support the hospital’s decision to install nora rubber flooring with nora nTx throughout its new tower.

 

nora systems, Inc. 
Phone: 1-800-332-NORA
Fax: (603) 894-6615
Email: info-us@nora.com
Website: www.nora.com/us

Related Stories

| Jan 3, 2012

VDK Architects merges with Harley Ellis Devereaux

Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 8, 2011

WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles

Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.

| Oct 17, 2011

Big D Floor covering supplies to offer Johnsonite Products??

Strategic partnership expands offering to south and west coast customers. 

| Oct 5, 2011

GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes

Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021