flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Sponsored Content Flooring

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Construction delays are common with projects as large as the $354 million Reading Hospital expansion. Maybe that’s why construction manager Jeff Hutwelker, project executive with LF Driscoll Co., LLC, was so pleased with his nora® experience. By Hutwelker’s estimates, nora nTx saved approximately two months in his construction schedule.


By nora | December 7, 2016

When Reading Hospital embarked on a 476,000-square-foot addition to its West Reading, Pennsylvania, location, the goal was to replace and relocate operating rooms spread across four buildings and provide 150 new private patient rooms. The nine-story tower that opened in October includes five floors of private patient rooms, 24 surgical suites, eight minor procedure rooms, reception and recovery areas and an expanded trauma unit. Most of the new facility features noraplan® eco floor covering with nora nTx.

nora nTx is a pre-applied, solvent-free adhesive backing that minimizes prep work and eliminates drying protocols, saving valuable time and money. The product is resistant to high moisture vapor emissions and has no pH limits, eliminating the need for moisture testing and remediation before installation.

According to Hutwelker, the application of nora nTx provided two advantages during construction. “It did not require a moisture mitigation system, which represents a savings in not only dollars, but also in time—two months in our construction schedule. Secondly, we had one company providing all the warranty for the flooring, which is pretty much unheard of in other projects. One warranty from one supplier is very helpful.”

 

 

Others involved in the project pointed to additional advantages nora flooring offers. David Major, the hospital’s director of facilities and construction, says “Maintenance of the product is greatly enhanced. We don’t have to unwax or wax the floors.”

Tim Cole, director of environmental services, agrees. “The floor offers as much as 20 to 30 percent in labor savings related to the care and maintenance of the floor. In addition, from an environmental standpoint, you can clean and maintain the floor with less caustic chemicals and cleaners as opposed to other traditional floor coverings.”

The floor’s simple maintenance regimen is also expected to improve patient throughput. Says Cole, “With nora flooring, we can turn over patient rooms very quickly—probably in half the time it would take to do a floor we have to clean and wax.” And he appreciates the floor’s low-gloss finish, which helps older patients sometimes disoriented by shiny floors.

Meanwhile, Marie Keim, Reading Health System’s director of epidemiology infection and prevention, applauds the floor’s contribution to infection prevention. “The surfaces are smooth; we don’t need to be concerned about residual water, bacteria and other items going into cracks and crevices and harboring any sort of bacteria or organisms. The other positive aspect of the nora flooring is that it resists staining...and the floor makes it much easier to stand throughout our day as we provide services to our patients.”

Comfort underfoot, stain and slip resistance, a simple maintenance regimen, improved indoor air quality and construction time and cost savings—together, these benefits support the hospital’s decision to install nora rubber flooring with nora nTx throughout its new tower.

 

nora systems, Inc. 
Phone: 1-800-332-NORA
Fax: (603) 894-6615
Email: info-us@nora.com
Website: www.nora.com/us

Related Stories

Flooring | Nov 6, 2017

Rubber flooring ready for traffic at Calgary airport

More than 400,000 sf of norament grano and noraplan sentica cover portions of the international terminal and Connections Corridor. 

Green | Sep 27, 2017

Wellness gains ground with real estate and property management professionals

Structure Tone survey finds LEED is still a selling point, but interest in resilience practices could be waning.

Sponsored | Flooring | Aug 24, 2017

Radiant heating provides poolside comfort

Radiant heats the objects in a room, making the environment more comfortable without the energy-intensive process of heating air.

Sponsored | Flooring | Aug 22, 2017

INSTALL revives acute care facility with forward-thinking installation

A complex installation and a phased timeline were executed flawlessly in a fully functional acute care facility thanks to a highly skilled, INSTALL-trained team.

Fire-Rated Products | Aug 15, 2017

Walking on glass: Clear floor system offers largest two-hour fire- resistive panels

The system uses the largest tested and listed individual glass panels for two-hour fire-resistive glass floor applications.

Products and Materials | Jul 21, 2017

Acrylic-infused wood flooring brings durability for commercial spaces

The product incorporates an acrylic-infused top layer.

Flooring | Jul 12, 2017

Membrane dials down the sound, while it cranks up the heat

A new membrane from Schluter Systems, Ditra Heat Duo, reduces sound transmission while also warming the floor and supporting the covering to ensure lasting installation.

Sponsored | Flooring | Jun 5, 2017

INSTALL sets stage for inspiration with expert installation

The challenge of a large space, mixed materials and intricate design were met by a highly skilled, INSTALL-trained team.

Multifamily Housing | Feb 1, 2016

Top 10 kitchen design trends for 2016

Charging stations, built-in coffeemakers, and pet stations—these are among the top kitchen design trends for the coming year, according to a new survey of kitchen and bath designers by the National Kitchen & Bath Association.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021