flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New residence hall to house 500 students at Duke University

University Buildings

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.


By David Malone, Associate Editor | December 20, 2017

Hollows Residence Hall is a 264,700-sf facility that will consist of two six-story buildings on Duke University’s West Campus in Durham, N.C. The two buildings will stand next to each other and be joined by a connecting portal.

Each building will be organized into nine houses that comprise 30 to 60 beds each. The houses will include suites with four single bedrooms and in-suite bathrooms, separate vanities, and kitchenette space. Common lounges, kitchens, and dedicated study rooms will also be located in each building. Some rooms will be compliant with the Americans with Disabilities Act and include space for an attendant. The suite-style rooms were designed in part from student input gathered via forums held with the university and the project’s architects.

There will also be nine rooms for resident assistants, one apartment for a graduate resident, and one apartment for a residential coordinator. In total, Hollows Residence hall will house 500 students.

The buildings’ exteriors will use a combination of the Duke Brick Blend with slate gabled roofs. The William Rawn Architects-designed project will seek LEED Silver certification. Skanska USA is currently building the project, which is expected to be completed by July 2019.

Related Stories

Sports and Recreational Facilities | Nov 27, 2017

The University of Memphis unveils the new home of the men’s basketball program

The Laurie-Walton Family Basketball Center will provide a strong commitment to donor and VIP cultivation.

Adaptive Reuse | Nov 10, 2017

Austin’s first indoor shopping mall becomes Austin Community College’s new digital media center

Renovation of the defunct mall represents Phase 2 of ACC’s $100 million adaptive reuse project.

University Buildings | Nov 6, 2017

A reconstructed building sets the standard for future rehabs at Cornell

Early AE collaboration played a major role in moving this project forward efficiently. 

University Buildings | Oct 13, 2017

The University of Oklahoma receives its first residential colleges

The residential communities were designed by KWK Architects and combine living and learning amenities.

University Buildings | Oct 12, 2017

USC to debut new bioscience center next month

The building is designed to maximize recruitment and interaction of scientists and researchers.

University Buildings | Oct 12, 2017

The Center for Wounded Veterans is a first for a university campus

The Chez Family Foundation Center for Wounded Veterans in Higher Education is the first building of its kind on a U.S. college campus.

University Buildings | Oct 10, 2017

A 1920s cheese factory is now a university science building

Almost 15,000 sf of space was added to the original, four-story building.

Sustainability | Oct 9, 2017

New Arizona State University building will reach triple net-zero performance

The science and research complex will include an atrium biome filled with plants and water.

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021