flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New residence hall to house 500 students at Duke University

University Buildings

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.


By David Malone, Associate Editor | December 20, 2017

Hollows Residence Hall is a 264,700-sf facility that will consist of two six-story buildings on Duke University’s West Campus in Durham, N.C. The two buildings will stand next to each other and be joined by a connecting portal.

Each building will be organized into nine houses that comprise 30 to 60 beds each. The houses will include suites with four single bedrooms and in-suite bathrooms, separate vanities, and kitchenette space. Common lounges, kitchens, and dedicated study rooms will also be located in each building. Some rooms will be compliant with the Americans with Disabilities Act and include space for an attendant. The suite-style rooms were designed in part from student input gathered via forums held with the university and the project’s architects.

There will also be nine rooms for resident assistants, one apartment for a graduate resident, and one apartment for a residential coordinator. In total, Hollows Residence hall will house 500 students.

The buildings’ exteriors will use a combination of the Duke Brick Blend with slate gabled roofs. The William Rawn Architects-designed project will seek LEED Silver certification. Skanska USA is currently building the project, which is expected to be completed by July 2019.

Related Stories

University Buildings | Oct 25, 2016

Columbia University dedicates its new campus with great fanfare

Transparency to the surrounding community played a big role in the campus’s design.

School Construction | Oct 23, 2016

As construction rebounds, education sector spending flattens

Post-recession slump suggests a settling in at a “normal” level similar to the mid aughts.

University Buildings | Oct 19, 2016

UC Merced to nearly double its size by 2020

Its growth strategy includes adding 1.2 million sf of space for teaching, housing, and research. 

University Buildings | Oct 12, 2016

The new Hancher Auditorium opens on University of Iowa campus

The building replaces the previous Hancher, which was irreparably damaged in the 2008 flood.

University Buildings | Oct 11, 2016

The University of Iowa gets a new Visual Arts Building

The building was a collaborative effort between BNIM and Steven Holl Architects and marks the sixth facility the two firms have worked together on

Sponsored | University Buildings | Oct 3, 2016

Enhancing university life: The smart shower bead

Residential spaces that need to meet high traffic demands while accommodating an ever-changing populace creates a unique set of obstacles for any educational institution’s housing.

Sponsored | University Buildings | Sep 29, 2016

UWM’s Kenwood Interdisciplinary Research Complex: The most distinctive building on campus

The largest building on campus, it was designed by Flad Architects to comply with LEED Gold Certification standards and to meet a wide range of current and future academic needs.

University Buildings | Sep 12, 2016

The University of Chicago’s newest residence halls are designed to be more like home

Abundant common spaces give students more chances to interact.

University Buildings | Aug 17, 2016

Supporting communities of motivated learners: reflections on SCUP-51

The two themes that were consistently woven into different topics were institutional transformation and connection with students.

University Buildings | Aug 16, 2016

New images of Rice University’s Moody Center for the Arts revealed by Michael Maltzan Architecture

The arts center will foster creativity for making and presenting works across all disciplines

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021