flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Science + Technology Engineering Firms

Top 50 Science + Technology Engineering Firms

Jacobs, Affiliated Engineers, and Vanderweil Engineers top Building Design+Construction’s annual ranking of the nation’s largest science + technology sector engineering and EA firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 12, 2016

Georgia Institute of Technology, Engineered Biosystems Building, Atlanta, Ga. Cooper Carry (architect), McCarthy Building Companies (GC), Newcomb & Boyd (MEP), Long Engineering (CE). Photo: Chris Cooper courtesy of Cooper Carry.

TOP 50 SCIENCE + TECHNOLOGY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Jacobs $51,420,000
2 Affiliated Engineers $29,447,000
3 Vanderweil Engineers $21,653,900
4 CRB $10,200,000
5 RMF Engineering $6,285,000
6 Mazzetti $5,199,075
7 Thornton Tomasetti $4,686,534
8 Newcomb & Boyd $3,466,430
9 Rist-Frost-Shumway Engineering $3,335,000
10 Global Engineering Solutions $3,275,000
11 BR+A Consulting Engineers $3,000,000
12 Arup $2,352,966
13 Ghafari Associates $2,000,000
14 BSA LifeStructures $1,969,607
15 Syska Hennessy Group $1,750,876
16 Bridgers & Paxton Consulting Engineers $1,667,247
17 Environmental Systems Design $1,571,840
18 Jensen Hughes $1,555,972
19 STV $1,378,299
20 KJWW / TTG $1,365,000
21 RDK Engineers $1,323,231
22 Spectrum Engineers $1,288,746
23 Ross & Baruzzini $1,284,549
24 ThermalTech Engineering $1,250,000
25 Hankins and Anderson $1,230,980
26 Karpinski Engineering $1,100,000
27 Sherlock, Smith & Adams $1,014,000
28 ME Engineers $1,000,000
29 Cardno Haynes Whaley $820,511
30 Pedco E & A Services $765,000
31 Coffman Engineers $698,634
32 I. C. Thomasson Associates $622,000
33 Smith Seckman Reid $511,913
34 P2S Engineering $504,514
35 Glumac $494,360
36 Peter Basso Associates $474,636
37 Bala Consulting Engineers $450,000
38 SSOE Group $390,000
39 dbHMS $384,000
40 Henderson Engineers $326,842
41 William Tao & Associates $315,389
42 Walter P Moore $315,202
43 Stanley Consultants $290,773
44 Highland Associates $220,000
45 KZF Design $216,000
46 JBA Consulting Engineers $131,855
47 H.F. Lenz Company $131,000
48 Wiss, Janney, Elstner Associates $100,000
49 CTLGroup $100,000
50 Architectural Engineers $79,964
51 G & W Engineering Corp. $50,013
52 Dunham Associates $50,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 28, 2013

Videos reveal City 2.0 ideas from 2012 TED Prize winners

Thought leader TED has released eight new videos from winners of its 2012 TED Prize: the City 2.0. The prize went to 10 winners involved in urban issues, including education, safety, health, food, and public space.

| Feb 26, 2013

CRSI releases new technical note on stainless steel reinforcing bars

The Concrete Reinforcing Steel Institute (CRSI) has released a new technical note, Frequently Asked Questions (FAQ) about Stainless Steel Reinforcing Bars, to its online collection.

| Feb 25, 2013

HOK sustainability expert Mary Ann Lazarus tapped by AIA for strategy consulting position

Mary Ann Lazarus, FAIA, LEED® AP BD+C, has accepted a two-year consulting position with the American Institute of Architects in Washington, DC. Her new position, which begins March 1, will focus on increasing the AIA's impact on sustainability across the profession. The St. Louis-based architect will continue consulting at HOK.

| Feb 25, 2013

Atkins appoints new CEO for North America

Atkins announces that Joe Boyer will join the company as CEO of its North American region on March 18, 2013. Boyer will join Atkins from Shaw Environmental & Infrastructure, Inc. in Austin, Texas, where he has held the position of president of its Federal division.

| Feb 25, 2013

AISC seeks proposals for development of BIM best practices guide

The American Institute of Steel Construction seeks assistance from BIM users in identifying and documenting best practices to facilitate the long-term standardization of BIM in structural steel construction.

| Feb 25, 2013

Turner employs rare 'collapsible' steel truss system at Seattle light rail station

To speed construction of the $110 million Capitol Hill Station light-rail station in Seattle, general contractor Turner Construction will use an unusual temporary framing method for the project's underground spaces.

| Feb 22, 2013

Dutch team's 'bioconcrete' can heal itself

Two researchers from Delft Technical University in Holland have developed a self-healing cement that can stop microcracks from forming in concrete.

| Feb 22, 2013

Defense department report: Green design saves taxpayers money

An independent report on energy efficiency and sustainability standards used by the Pentagon for military construction affirms the value of LEED-certified high performing buildings to America’s military and U.S. taxpayers.

| Feb 21, 2013

BD+C's 2011 White Paper: Zero and Net-Zero Energy Buildings + Homes

We submit our eighth White Paper on Sustainability in the hope that it will inspire architects, engineers, contractors, building owners, developers, building product manufacturers, environmentalists, policymakers, government officials, corporate executives, officeholders, and the public to foster the development of net-zero energy buildings and homes.

| Feb 21, 2013

BD+C's 2008 White Paper: Green Buildings + Climate Change

In this White Paper, we provide concrete ways in which AEC professionals can have a positive role in addressing climate change.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021