flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Mixed-Use

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Tinaglia Architects designed the project.


By David Malone, Associate Editor | July 24, 2019
Arlington 425 aerial

All renderings courtesy Village of Arlington Heights/ Tinaglia Architects.

A $150 million, three-building mixed-use development is set to rise on a vacant parcel of land in Arlington Heights, a Chicago suburb about 30 miles northwest of the city. The Village Board recently approved the project, which will be the Village’s largest new development for Downtown in two decades.

Dubbed Arlington 425, the project includes a four-story, 54-unit residential building; a nine-story, 182-unit apartment building with the bottom two floors set aside for commercial space; and a 13-story, 125-unit apartment building that will include a six-story parking garage. The development will have a total of 361 units and over 44,000 sf of commercial space.

 

Rendering of Arlington 425 street level

 

An affordable housing plan was also agreed to that includes 18 affordable units (5% of the 361) for those at or below 60% of the area median income. The affordable units would be spread across two of the three buildings and include studio and one-bedroom floor plans.

The project will increase the parcel’s property taxes from about $40,000 a year to $1.5 to $2 million per year. Construction is not expected to begin until next spring at the earliest.

 

See Also: Shanghai’s T20 stacks office and community space atop a plant-filled parking garage

 

Tinaglia Architects designed the project. CCH LLC is the developer.

 

Arlington 425 highland building

Tags

Related Stories

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

Mixed-Use | Sep 26, 2017

Perkins+Will designs new international business community in Cali, Colombia

The new free trade zone is designed to resemble a small village.

Mixed-Use | Sep 25, 2017

Getting there is half the fun: Mass transit helps entertainment districts thrive

In Los Angeles, the entertainment district L.A. Live is expected to benefit from the proposed expansion of the city’s mass transit system.

Mixed-Use | Sep 25, 2017

One of L.A.’s most sought-after neighborhoods receives a new mixed-use development

The new development will feature 166 units and 9,000 sf of ground-floor retail.

Mixed-Use | Sep 22, 2017

Defending against the online dragon

Some entertainment districts are going light on retail, partly because “the bulk of the leasing demand is for dining and entertainment,” say Barry Hand, a Principal with design mega-firm Gensler in Dallas.

Mixed-Use | Sep 21, 2017

Entire living rooms become balconies in a new Lower East Side mixed-used development

NanaWall panels add a unique dimension to condos at 60 Orchard Street in New York City.

Mixed-Use | Sep 18, 2017

Urban heartbeat: Entertainment districts are rejuvenating cities and spurring economic growth

Entertainment districts are being planned or are popping up all over the country.

Mixed-Use | Sep 14, 2017

Capital One eschews the traditional bank with the Capital One Café

The new branch in downtown Santa Monica offers 8,400 sf of space designed by Gwynne Pugh Urban Studio.

Libraries | Sep 1, 2017

Johnson Favaro selected to design new main library in Riverside, Calif.

The choice comes after a 12-year planning process and a yearlong selection process.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021