flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Mixed-Use

Three-building development to rise on vacant parcel in Chicago suburb Arlington Heights

Tinaglia Architects designed the project.


By David Malone, Associate Editor | July 24, 2019
Arlington 425 aerial

All renderings courtesy Village of Arlington Heights/ Tinaglia Architects.

A $150 million, three-building mixed-use development is set to rise on a vacant parcel of land in Arlington Heights, a Chicago suburb about 30 miles northwest of the city. The Village Board recently approved the project, which will be the Village’s largest new development for Downtown in two decades.

Dubbed Arlington 425, the project includes a four-story, 54-unit residential building; a nine-story, 182-unit apartment building with the bottom two floors set aside for commercial space; and a 13-story, 125-unit apartment building that will include a six-story parking garage. The development will have a total of 361 units and over 44,000 sf of commercial space.

 

Rendering of Arlington 425 street level

 

An affordable housing plan was also agreed to that includes 18 affordable units (5% of the 361) for those at or below 60% of the area median income. The affordable units would be spread across two of the three buildings and include studio and one-bedroom floor plans.

The project will increase the parcel’s property taxes from about $40,000 a year to $1.5 to $2 million per year. Construction is not expected to begin until next spring at the earliest.

 

See Also: Shanghai’s T20 stacks office and community space atop a plant-filled parking garage

 

Tinaglia Architects designed the project. CCH LLC is the developer.

 

Arlington 425 highland building

Tags

Related Stories

Mixed-Use | May 24, 2017

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

The 36,000-sm project will cover a city block and include a residential tower.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

Mixed-Use | May 17, 2017

The Lincoln Common development has begun construction in Chicago’s Lincoln Park

The mixed-use project will provide new apartments, condos, a senior living facility, and retail space.

Reconstruction & Renovation | Apr 27, 2017

One of the last abandoned high-rises in Detroit’s downtown core moves one step closer to renovation

Kraemer Design has been selected as the architect of record and historic consultant on the Detroit Free Press building renovations.

Mixed-Use | Apr 25, 2017

Dutch building incorporates 22 emojis into its façade

The emoji building is part of a larger mixed-use development built around a 150-year-old oak tree.

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021