Kaohsiung Stadium, the main venue of the 2009 World Games, made its spectacular debut in July 2009. Designed by Toyo Ito & Associates, one of the top architects in Japan, and Ricky Liu & Associates from Taiwan, the stadium can hold 45,000 spectators.
In addition to its eye-catching, horseshoe-shaped appearance, the building is the first stadium in the world powered by solar energy, and has been awarded the “Green Building Certification” by the Taiwan authorities.
Search for an effective panel fixing solution
In order to maximize the natural daylight, 8,844 solar panels were strategically mounted around the roof of the stadium. The solar panels generate more than one million kilowatt-hours of electricity per year, which supports approximately 80 percent of the stadium’s energy needs. To achieve this success, architects and contractors needed to resolve a series of technical issues related to the built-in panels. The job required an effective panel fixing design with optimum energy transfer rate, plus excellent thermal and weathertight performance.
Four-sided structural sealant glazing saves the day
Dow Corning was consulted from the very beginning of the project, and ultimately recommended using four-sided structural sealant glazing to bond the glass solar panels to aluminum sub-frame. This approach maximizes the daylight exposure and hence the generation of clean solar energy by the solar modules. Each unit of the roof façade system has three glass panels, including two solar glass panels (containing solar cell and low-iron glass panels) and one blue tinted tempered glass pane. Dow Corning 983 Structural Glazing Sealant was used for bonding the solar panels and weatherproofing.
Key Participants
Construction Office, Public Works Bureau, Kaohsiung City Government
Toyo Ito & Associates
Ricky Liu & Associates
Fu Tsu Construction
Delta Electronics Inc.
Dow Corning - Silicone Sealant ProviderProducts
Dow Corning 983 Structural Glazing Sealant
With the proven, silicone-bonding technology, the structural silicone not only helps this horseshoe-shaped solar roof building withstand earthquakes, acid rain, typhoons, humidity and extreme heat and UV radiation, but also improves its thermal and acoustic performance by continuous and effective sealing the facade. Dow Corning provides a complete solution, including high performance sealants and professional technical support, which ensures correct sealant application and long-term performance.
Leading the way for more BIPV success
The Kaohsiung World Games Main Stadium was the first 4-sided structurally glazed BIPV (Building Integrated Photovoltaic) roofing project that Dow Corning participated in Greater China. It is one of the largest BIPV projects in Greater China. Dow Corning silicone structural sealants allow creativity and design freedom, combined with lower life-cycle cost and improved thermal and acoustic performance of the facade. Dow Corning structural glazing sealants are now widely used in major BIPV facades in China, including the 2010 World Expo China, National Pavilion and Theme Pavilion.
Click here to view a short animated presentation about how Dow Corning solutions and support helped to create this revolutionary solar-powered stadium.
Or, to learn more about the Dow Corning products featured in this case study, as well as our many other proven materials for the construction industry, please click here. To speak to your nearest Dow Corning representative, visit dowcorning.com/ContactUs. +
Related Stories
| Nov 27, 2013
University reconstruction projects: The 5 keys to success
This AIA CES Discovery course discusses the environmental, economic, and market pressures affecting facility planning for universities and colleges, and outlines current approaches to renovations for critical academic spaces.
| Nov 26, 2013
7 ways to make your firm more successful
Like all professional services businesses, AEC firms are challenged to effectively manage people. And even though people can be rather unpredictable, a firm’s success doesn’t have to be. Here are seven ways to make your firm more successful in the face of market variability and uncertainty.
| Nov 26, 2013
Design-build downsized: Applying the design-build method in an era of smaller projects
Any project can benefit from the collaborative spirit and cooperative relationships embodied by design-build. But is there a point of diminishing return where the design-build project delivery model just doesn't make sense for small projects? Design-build expert Lisa Cooley debates the issue.
| Nov 25, 2013
Electronic plan review: Coming soon to a city near you?
With all the effort AEC professionals put into leveraging technology to communicate digitally on projects, it is a shame that there is often one major road block that becomes the paper in their otherwise “paperless” project: the local city planning and permitting department.
| Nov 22, 2013
Kieran Timberlake, PE International develop BIM tool for green building life cycle assessment
Kieran Timberlake and PE International have developed Tally, an analysis tool to help BIM users keep better score of their projects’ complete environmental footprints.
| Nov 20, 2013
Architecture Billings Index slows in October; project inquiries stay strong
Following three months of accelerating demand for design services, the Architecture Billings Index reflected a somewhat slower pace of growth in October. The October ABI score was 51.6, down from a mark of 54.3 in September.
| Nov 19, 2013
Pediatric design in an adult hospital setting
Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.
| Nov 18, 2013
6 checkpoints when designing a pediatric healthcare unit
As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.
| Nov 18, 2013
Lord Aeck Sargent opens metro D.C. office, updates brand
Architecture, design, and planning firm unveils its sixth office, plus a new visual identity system and website
| Nov 18, 2013
How do construction professionals use social media?
LinkedIn is the social network used by most construction professionals, according to the results of a newly released national survey conducted by the Construction Marketing Association.