flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Codes and Standards

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.


By Peter Fabris, Contributing Editor | April 24, 2017

PIxabay Public Domain

A new report released by the Center for an Urban Future found significant flaws in how New York City manages capital projects for libraries and cultural institutions.

These projects encounter “staggering delays and exorbitant costs” the report says. The median new library and cultural project takes about seven years to complete and costs $930 per square foot, or roughly twice the cost of building a new office tower in the city, the report says.

The report, a joint project with the Citizens Budget Commission, analyzed 144 capital projects for libraries and cultural organizations completed between fiscal years 2010 and 2014. All were managed by the city’s Department of Design and Construction (DDC).

The report found that even seemingly routine maintenance projects end up taking years. For instance, the median mechanical system upgrade—including replacement and installation of fire alarms, boilers, and heating/cooling systems—took 4.3 years to complete. The study also found that when institutions are granted permission to self-manage capital projects, which is allowed on rare occasions, the projects typically take a fraction of the time and cost roughly 40% less.

Related Stories

Codes and Standards | Sep 17, 2019

California will enact rent cap bill limiting rent increases to 5% plus inflation

Applies to apartments built at least 15 years ago.

Codes and Standards | Sep 17, 2019

Zero energy buildings can be constructed with no added upfront cost

ROI can be realized in as little as one year.

Codes and Standards | Sep 13, 2019

Researchers use U. of Arkansas buildings as testbed for CLT panels

Investigation could influence future use of the materials.

Codes and Standards | Sep 13, 2019

At least 30 U.S. cities have adopted stricter building energy codes since 2017

Some followed their states in implementing more robust standards.

Codes and Standards | Sep 12, 2019

Illinois law sets maximum retainage on private projects

The change is expected to give contractors bigger checks earlier in project timeline.

Codes and Standards | Sep 10, 2019

Retreat may be the best option for some coastal communities in face of sea level rise

A new study makes the case for relocating in a "strategic, managed" manner.

Codes and Standards | Sep 9, 2019

Free app calculates maximum allowable heights and areas for buildings

A free app that calculates the maximum allowable heights and areas for buildings of various occupancy classifications and types of construction has been released.

Codes and Standards | Sep 6, 2019

Standard for assessing frame deflection using one component polyurethane foams updated

The standard offers guidance when installing fenestration products.

Codes and Standards | Aug 29, 2019

The high cost of gridlock: $166 billion per year

Growing economy means more jobs, more cars, more hours stuck in traffic.

Codes and Standards | Aug 29, 2019

Industry leaders ask for government help as trades shortage worsens

AGC asks for more funding for education and increased immigration to fill gaps.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021