‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Codes and Standards

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.


By Peter Fabris, Contributing Editor | April 24, 2017

PIxabay Public Domain

A new report released by the Center for an Urban Future found significant flaws in how New York City manages capital projects for libraries and cultural institutions.

These projects encounter “staggering delays and exorbitant costs” the report says. The median new library and cultural project takes about seven years to complete and costs $930 per square foot, or roughly twice the cost of building a new office tower in the city, the report says.

The report, a joint project with the Citizens Budget Commission, analyzed 144 capital projects for libraries and cultural organizations completed between fiscal years 2010 and 2014. All were managed by the city’s Department of Design and Construction (DDC).

The report found that even seemingly routine maintenance projects end up taking years. For instance, the median mechanical system upgrade—including replacement and installation of fire alarms, boilers, and heating/cooling systems—took 4.3 years to complete. The study also found that when institutions are granted permission to self-manage capital projects, which is allowed on rare occasions, the projects typically take a fraction of the time and cost roughly 40% less.

Related Stories

Codes and Standards | Oct 24, 2019

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two weeks.

Codes and Standards | Oct 22, 2019

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Enhancing building utilization and reusing materials also aid carbon reduction.

Codes and Standards | Oct 18, 2019

St. Louis could save $61 million per year in energy costs by improved building performance

GHG gases can be reduced by at least 11% with upgrades to public buildings and large private buildings.

Codes and Standards | Oct 17, 2019

Slow payments cost GCs and subs $64 billion annually

Study finds 51-day average payment turnaround.

Codes and Standards | Oct 16, 2019

Cool pavement can make people hotter

Reflective coatings channel sunlight raising temperatures where pedestrians walk.

Codes and Standards | Oct 15, 2019

Utah adopts 2018 International Energy Conservation Code

Provisions include increased building envelope performance and reduced air infiltration.

Codes and Standards | Oct 14, 2019

States continue to beef up energy efficiency codes

ACEEE 50-state scorecard finds latest IECC code gaining adherents.

Codes and Standards | Oct 9, 2019

DOE releases Better Buildings Healthcare Financing Primer

Outlines financial strategies to implement energy-efficiency projects in healthcare.

Codes and Standards | Oct 8, 2019

Zero Carbon Buildings for All aims for ambitious emission reduction targets

Organization makes commitment to net zero carbon for all buildings by 2050.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021