In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.
Slated for completion by summer 2025, the South Education Center aims to provide access to high-quality early childhood education for the southeast side of San Antonio—a traditionally under-resourced region and an area identified as a childcare desert.
In recent years, south and southeast San Antonio has seen a decline in high-quality childcare options, especially for families with kids 4 years and younger, according to a press statement from Pre-K 4 SA and HOLT Group.
The design by RDG Planning+Design offers abundant light throughout the building. The center’s colors and natural materials, such as stone, wood, and green walls, were inspired by the local landscape, culture, and landmarks, including the San Fernando Cathedral.
Each space in the center has been designed to foster young children’s growth and development and encourage learning through play. Every classroom offers direct access to outdoor porch settings and play areas. All exterior play areas are shielded by the building to create a safe environment away from busy streets and parking lots.
“This school takes inspiration from the natural surroundings and the cultural vibrancy of San Antonio, seamlessly integrating indoor and outdoor spaces to create an engaging, enriching place for young learners,” Antonio Plascencia, principal senior designer, said in a statement.
The state-of-the-art facility features modern classrooms equipped to meet the highest early childhood education standards. Specialized spaces will support families, teacher collaboration, and interactive learning and play-based activities.
On the Building Team:
Owner/developer: Holt Texas, Ltd.
Design architect: RDG Planning+Design
Architect of record: Pfluger Architects
MEP engineer: Cleary Zimmermann Engineers
Structural engineer: Lundy & Franke Engineering
General contractor: G.W. Mitchell Construction
Landscaping: Rialto Studio
Technology: Combs Consulting Group
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2001%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2002%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2003%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2004%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2005%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2006%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Classroom_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Corporate%20Entry_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Corridor_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Corridor_Final_logos_CROPPED%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Education%20Entry_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Education%20Plaza_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Open%20Office_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Training%20Room_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
Related Stories
| Aug 11, 2010
JE Dunn, Balfour Beatty among country's biggest institutional building contractors, according to BD+C's Giants 300 report
A ranking of the Top 50 Institutional Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms
A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Architecture Billings Index flat in May, according to AIA
After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.
| Aug 11, 2010
Construction employment declined in 333 of 352 metro areas in June
Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America. The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.
| Aug 11, 2010
Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors
A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Gilbane, Manhattan Construction top BD+C's ranking of the nation's 50 largest K-12 school contractors
A ranking of the Top 50 K-12 School Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Best AEC Firms of 2011/12
Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +
| Aug 11, 2010
Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report
A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants