In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.
Slated for completion by summer 2025, the South Education Center aims to provide access to high-quality early childhood education for the southeast side of San Antonio—a traditionally under-resourced region and an area identified as a childcare desert.
In recent years, south and southeast San Antonio has seen a decline in high-quality childcare options, especially for families with kids 4 years and younger, according to a press statement from Pre-K 4 SA and HOLT Group.
The design by RDG Planning+Design offers abundant light throughout the building. The center’s colors and natural materials, such as stone, wood, and green walls, were inspired by the local landscape, culture, and landmarks, including the San Fernando Cathedral.
Each space in the center has been designed to foster young children’s growth and development and encourage learning through play. Every classroom offers direct access to outdoor porch settings and play areas. All exterior play areas are shielded by the building to create a safe environment away from busy streets and parking lots.
“This school takes inspiration from the natural surroundings and the cultural vibrancy of San Antonio, seamlessly integrating indoor and outdoor spaces to create an engaging, enriching place for young learners,” Antonio Plascencia, principal senior designer, said in a statement.
The state-of-the-art facility features modern classrooms equipped to meet the highest early childhood education standards. Specialized spaces will support families, teacher collaboration, and interactive learning and play-based activities.
On the Building Team:
Owner/developer: Holt Texas, Ltd.
Design architect: RDG Planning+Design
Architect of record: Pfluger Architects
MEP engineer: Cleary Zimmermann Engineers
Structural engineer: Lundy & Franke Engineering
General contractor: G.W. Mitchell Construction
Landscaping: Rialto Studio
Technology: Combs Consulting Group
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2001%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2002%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2003%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2004%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2005%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-15%20Exterior%2006%20rendering%20courtesy%20Pfluger%20Architects.jpg)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Classroom_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Corporate%20Entry_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Corridor_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Corridor_Final_logos_CROPPED%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Education%20Entry_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Education%20Plaza_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Open%20Office_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
![San Antonio's Pre-K 4 SA school will provide early childhood education to a traditionally under-resourced region. Rendering courtesy Pfluger Architects](/sites/default/files/inline-images/2024_01-05%20Training%20Room_Final_logos%20Tony%20rendering%20courtesy%20Pfluger%20Architects.png)
Related Stories
| Oct 22, 2012
Two-Hour Curtain Wall Lets Light In and Keeps Fire Out at Prairie Hills Junior High School
New school’s south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing.
| Sep 7, 2012
Net-zero energy pioneers on the el-hi frontier
Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.
| Sep 7, 2012
The keys to success in the K-12 school market
When educators and school administrators describe their vision for new K-12 school buildings as ‘21st-century learning spaces,’ they’re not exaggerating. Many new schools are truly different in concept from their counterparts of only a few years ago.
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 20, 2012
K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13
The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.
| Jul 2, 2012
Plumosa School of the Arts earns LEED Gold
Education project dedicated to teaching sustainability in the classroom.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.