flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Richard Meier unveils design scheme for residential high-rise in Taipei

Multifamily Housing

Richard Meier unveils design scheme for residential high-rise in Taipei

The sleek and minimalist luxury tower will offer guests and residents views of the iconic Taipei 101.


By Adilla Menayang, Assistant Digital Editor | September 23, 2015
Richard Meier & Partners unveil Taipei residential high-rise design

The tower’s plaza is entirely dedicated for public use. Renderings by Vize, courtesy Richard Meier & Partners

Juxtaposed against the super-tall pagoda-like Taipei 101 tower, Richard Meier & Partners designed a sleek and slim residential high-rise commissioned by Continental Development Corporation, designboom reports.

Officially titled the CDC 55 Timeless Xin-Yi tower, the building will rise to a total height of 417 feet, standing atop a public field and plaza, dubbed to be a new precedent in Taiwan where a private building dedicates its entire landscape to the public.

With configurations that range from two apartments per floor to one large apartment unit per story, the development is targeted at high-end buyers. Luxury amenities include an outdoor swimming pool and roof deck offering views of the city’s landmark Taipei 101 and the rest of the skyline.

According to designboom, the building’s horizontal and vertical organization is “based on a strong geometric clarity.”

“The relationship between these two main elements is emphasized through a subtle shift in both plan and elevation, creating a dynamism and variation in scale that responds to the immediate urban environment,” the architects explain. “The solid north volume contains the core of the residential units that flows toward the transparent south volume, which is a natural-light-filled space where living, social, and the more public programs are located. A carefully crafted geometric organization allows viewing corridors towards the mountains in the far distance.”

Construction is under way, and is scheduled to be completed in 2017.

 

Related Stories

Multifamily Housing | Oct 30, 2017

Multifamily ventilation: Help buildings breathe

What's the right set of "lungs" for your building?

Multifamily Housing | Oct 29, 2017

Multifamily visionaries: The Beach Company’s family ties

Spanning four generations, The Beach Company continues to expand its development footprint across the Southeast.

Greenbuild Report | Oct 19, 2017

Can 'living well' sell?

As the competition for renters and buyers heats up, multifamily developers look to health and wellness for an edge.

Multifamily Housing | Oct 19, 2017

Enlightened conversion: A church becomes condos in D.C.

Once there were 857 churches in the District of Columbia. Now there are 856. One of them became an award-winning condominium complex.

University Buildings | Oct 13, 2017

The University of Oklahoma receives its first residential colleges

The residential communities were designed by KWK Architects and combine living and learning amenities.

Multifamily Housing | Oct 11, 2017

A 267-unit multifamily community is under construction in Summerville, S.C.

Summer Wind will be about half an hour outside of Charleston, S.C., in the rapidly expanding Summerville submarket.

Multifamily Housing | Oct 9, 2017

6 new products for the multifamily construction market

Bamboo wall panels, an adaptable prep sink, and a two-tiered bike parking system are among the product innovations geared for multifamily buildings.

Multifamily Housing | Sep 27, 2017

Pickleball, anyone?

Two-and-a-half million Americans are playing the game with the funny name.

Mixed-Use | Sep 25, 2017

One of L.A.’s most sought-after neighborhoods receives a new mixed-use development

The new development will feature 166 units and 9,000 sf of ground-floor retail.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021