Renovation can turn older university buildings into high-performing labs

University Buildings

Renovation can turn older university buildings into high-performing labs

A veteran laboratory planner and designer offers advice on when, why, and how to turn an outmoded campus building into a sparkling new research and teaching lab.


By DAVID MILLER, ASSOC. AIA, LEED AP | June 3, 2020
Barnes Hall of Science at Franklin College

The Barnes Hall of Science at Franklin College, Franklin, Ind., underwent a complete renovation with a new wing.

Colleges, universities, corporations, and governments are finding that adapting older buildings to house laboratory facilities can be a viable alternative to new construction—if the conditions are right. When the right strategy is implemented, existing structures can be transformed into high-performance facilities.

 

FIVE FACTORS IN DECIDING WHETHER TO RENOVATE

When considering renovation, at least five criteria will help determine if the effort should be pursued:

  1. The campus is landlocked. If the campus is landlocked, or if there is a self-imposed restriction on increasing the total physical footprint, growth is limited to existing acreage or square feet. The demand for science and technology facilities is still on the rise, yet enrollments are projected to drop over the next 10 years. The University of Tulsa has taken action by reimagining its purpose and reorganizing its structure, including a STEM-heavy curriculum.
  2. Infrastructure has capacity. Most campuses have a utility loop of some kind, typically steam and chilled water. Yet when older buildings are renovated into research facilities, the robust MEP requirements can present a capacity challenge.
  3. Sustainability is a priority. Repurposing and upgrading existing facilities is one of the best ways to reduce-reuse-recycle. Construction waste doubled the amount of municipal waste in 2017, most of which came from demolishing buildings.
  4. Funding is limited. When funds are tight, renovating can be the most cost-effective solution. The cost of land acquisition can be extremely high, especially when landowners realize the value of the property for the institution. Moreover, the core and shell of existing buildings are already in place; their detail and character can be expensive to reproduce.
  5. There is historical value or alumni support. A once-popular building with sentimental value can motivate alumni to donate toward its preservation. Moreover, public perception of state and local projects typically favors renovation, especially when the character of a beautiful quadrangle or green space would be destroyed if a new facility were built.

 

The Anna Hiss Gymnasium complex is being repurposed as a robotics laboratory at The University of Texas at Austin. All images courtesy BSA LifeStructures

 

At the University of Texas at Austin, there was great interest in preserving the Hiss Gymnasium, a twin-gymnasium women’s complex open since 1930.  Named after Dr. Anna Hiss, a pioneer in women’s athletics, the building was historically significant for housing Dr. Hiss’s vision of advancing women’s sports programs. In addition, the gymnasium was a beautiful example of the signature Mediterranean features of blended camel exterior brick, red Spanish tile roof, arched windows, graceful patios, and deep roof overhangs set in the 1910 University campus plan.3 

The building is being transformed into the Anna Hiss Robotics Institute, an interdisciplinary research center combining Robotics, Computer Science, Artificial intelligence, Mechanical and Electrical Engineering, and the Fine Arts College’s Industrial Design Department. The Army Futures Command will be located in the facility, bringing their robotic and positional and navigational technology research to partner with the university and the private sector.

 

THE BUDGET QUESTION: WILL THE JOB PENCIL OUT?

Renovating facilities typically cost less than building comparable new square footage. However, the building should be thoroughly evaluated for conditions and adaptability. There are numerous additional costs that are unique to renovation, including forensic engineering, as-built drawings, filed verifications, demolition, phasing plans, move management, temporary relocation, and remediation. An extended schedule resulting from demolition and phasing should also be accounted for in fees and general conditions. 

All these issues should be analyzed and planned for by the project team. However, given there are no land acquisition costs and that a new core and shell would account for about 30% of construction costs, renovating can prove to be an affordable option.

 

KEEP SURPRISES TO A MINIMUM

Perhaps the biggest concern about renovating is unforeseen conditions. How can we prevent as many bad surprises as possible? Unforeseen conditions inevitably lead to change orders and additional costs. Removing the ceiling to get a look at what’s hidden is a start. But f the building can be vacated, the demolition is accelerated, and knowing exactly what is behind walls takes the mystery out of estimating and scheduling.

But not all buildings can be vacated. However, some surprises can be minimized through technology.  3D laser scanning brings a new level of accuracy and forensic information, which speeds the field verification as well as the design process.

 

Torii Lab BIM model for plant research

 

3D laser scanning, BIM, and virtual reality modeling allowed existing equipment from across the country to be fitted virtually and accurately at the new plant science lab at University of Texas at Austin. BIM model: BSA LifeStructures

 

The Torii Plant Science Lab is a renovation within the Neural and Molecular Science Building at the University of Texas. Dr. Keiko Torii, a faculty member at the University of Washington in Seattle and a Principal Investigator at Nagoya University in Japan, was scheduled to arrive in Austin during the construction of her new lab. Laser scanning made it easier for the design team to need her needs.

Dr. Torii, who has been called one of the 15 most innovative plant biologists in the U.S., was bringing several pieces of specialized equipment with her that needed to be test fitted to the space. The accuracy of the scans made accommodating the space and utility needs of the equipment much easier by eliminating countless filed verifications. The design team was also able to accurately modify the lab module to better fit the space and include a white boarding area.

Virtual reality technology has advanced to become a real-time design tool. A Midwest contract research organization’s space needs were recently studied, including labs for their product development department with windows on a tour route to keep guests out of the R&D areas. Clients can now wear VR goggles to be taken on a virtual tour of the space during design, led by an avatar of the designer. The views into the labs could be virtually seen, allowing for instant virtual sketches to make improvements.

 

GET YOUR SPACE ALLOCATIONS RIGHT

Space standards for teaching and research labs are constantly changing. STEM pedagogies such as eer-Led Team Learning and Process Oriented Guided Inquiry Learning advocate problem solving and team-based learning in the classroom. Research labs are becoming more specialized and have turned into collaborative, interdisciplinary facilities. Formulaic and standardized lab designs can render the space obsolete before construction is complete.

At Butler University, in Indianapolis, two 1970s-era science and technology buildings, Gallahue and Holcomb Halls, are being renovated and connected by a new third structure. All the sciences on the campus will be consolidated in the new complex.  The theme of the new facility could be summed up in two words: collaboration and connection.

The class labs embrace the new pedagogies with team lab benches and seating to foster interaction. Researchers and students share prep areas and conduct some research together. Undergraduate research, recommended by the National Science Foundation, completely changes the undergraduate allocation standards for the sciences.

 

Purdue University’s Hobart and Russell Creighton Hall of Animal Sciences

Collaboration areas, like these at Purdue University’s Hobart and Russell Creighton Hall of Animal Sciences, have increased the net programmed area in laboratory research and teaching facilities.

 

But the greatest change is found outside of the labs. Research has shown that interdisciplinary collaboration is key to new discoveries, and that the most productive collaborations happen outside of the work area.  At Butler University, faculty and students interact in collaboration zones scattered throughout the facility. These areas are placed near the horizontal and vertical crossroads, creating informal gathering places. The success of these areas has caused their average total space in laboratory facilities to increase dramatically to nearly 20% of net square feet per student.

 

PROVIDING FOR SAFETY AND SECURITY

Renovations usually require additional safety improvements such as updated egress, fire sprinklers, and smoke evacuation systems. If the use of a building is being changed, the building must be updated to meet current codes. But the stakes are even higher in laboratory facilities.

A major research institution suffered a laboratory explosion when too much hydrogen built up in an anaerobic hood that was used to study bacteria. It serves as a grim reminder that safety is the top priority in laboratories.

Hood computational fluid dynamics (CFD) is a must to make sure air changes and hood containment are functioning properly to pull hood fumes away from users. Safety showers and eyewashes are standard safety equipment, but drains may be required or prohibited, depending on the jurisdiction.

Visibility is a safety concern, especially if newly trained undergraduates are conducting experiments.  Instructors and lab managers need column-free views throughout the entire lab to be able to see their students.

The renovated facility will need a waste management strategy for biologics or chemicals to address such issues as the type and volume of waste and whether central or on-site storage/handling/holding facilities will be used.

If chemicals are going to be stored on site, the fire rating dictates the amount of storage allowed per floor.

Renovating a research building while it is occupied presents significant construction risks, notably:

  • Isolating construction areas from the curious
  • Rerouting vehicular and pedestrian traffic
  • Controlling dusts, fumes and odors
  • Eliminating tripping hazards
  • Scheduling utility interruptions

 

UNDETECTED STRUCTURAL PROBLEMS CAN BE COSTLY TO REMEDIATE

Structural issues can be anything from potential structural failure to vibration stabilization. If extensive structural work is necessary to save an aging building, costs can reach beyond the typical cost of building a new facility, and creative solutions are called for.

Structural issues needed to be addressed at the Everitt Laboratory, which once housed the electrical engineering program at the University of Illinois at Urbana-Champaign, before it could become the new home of the Carle Illinois College of Medicine bioengineering department and the Jump Simulation Center.

The U-shaped building had a double-loaded corridor in one wing which did not work for the new cell and tissue culture teaching area. The prep areas needed to be on the same side of the corridor as the labs. The corridor was strategically shifted off-center to allow prep areas to be adjacent to the labs while burying the columns in the new walls.

By replacing the concrete masonry unit interior walls with drywall, the structural load was lightened to help limit the changes necessary to add a two-story infill. The infill is on top of a below-grade basement in the open U-shape of the building footprint. Only six columns needed reinforcement from helical tiers, with girders spanning three column pairs to support the infill.

 

REPLACING OUTDATED MEP SYSTEMS

Chances are that the mechanical and electrical systems in an older building are going to be inadequate. Furthermore, the demands of modern technology require an electrical capacity well beyond what was anticipated in previous decades. Computers, wireless technology, projection systems, and other technologies eat up space, generate heat, and suck up gobs of electricity.

Nearly every older facility will have lower floor-to-floor heights than their modern counterparts. Running ductwork is next to impossible. A little creativity, however, can uncover potential design opportunities when facing such challenges.

For example, the low floor-to-floor height at Miami University’s Pearson Hall, in Oxford, Ohio, limited the use of mechanical ductwork above the ceiling. A chilled beam system, which requires smaller air ducts, was the ideal choice for the lab. The lower operating cost provided a short payback period for the system.

At Indiana University’s School of Medicine, the Van Nuys Medical Science Building laboratories were updated to meet current standards. The floor-to-floor heights were even lower, so serving the new laboratory spaces with adequate HVAC systems was problematic. The solution: locate the new air-handling unit on the roof and create new mechanical chases down the exterior of the building to supply the labs vertically. The chases were incorporated into a new brick exterior of the building.  

 

chilled beam heating and cooling system in Miami University’s Pearson Hall

A chilled beam heating and cooling system in Miami University’s Pearson Hall was the right choice for the low floor-to-floor heights.

 

DEALING WITH PHASING AND DISRUPTION

Nothing can disrupt building activities like a multiphase renovation. But if carefully planned, noise, dust, and other inconveniences can be kept to a minimum. The Pearson Hall renovation at Miami University was such a project. The 201,000-sf facility housed biology and chemistry research labs and classrooms. The renovation was performed in seven phases over three years.

Ten researchers were relocated to unused library space across the street from Pearson; the vacated space in Pearson then served as swing space during the renovation. Construction was orchestrated in phases so that no other occupants had to move more than once.

Mechanically, the building was divided into quadrants. The phasing took advantage of the mechanical layout with a vertical phasing plan by quadrant.

 

TURNING DIFFICULTIES INTO OPPORTUNITIES

If handled correctly, many of the challenges associated with renovation of university science and technology buildings scan be turned into opportunities. Through careful planning and engaging an experienced design and construction team, renovation will remain a viable option for campuses across the U.S.

 

ABOUT THE AUTHOR

David Miller (dmiller@bsalifestructures.com) is the National Director of BSA LifeStructure’s Discovery practice. His 30-plus years of experience includes complex research and teaching environments in higher education, corporate research, and the health sciences.

 

 

 

Related Stories

| Feb 23, 2011

The library is dead, long live the library

The Society for College and University Planning asked its members to voice their thoughts on the possible death of academic libraries. And many did. The good news? It's not all bad news. A summary of their members' comments appears on the SCUP blog.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Apartment complex caters to University of Minnesota students

Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.

| Feb 11, 2011

Four-story library at Salem State will hold half a million—get this—books!

Salem State University in Massachusetts broke ground on a new library and learning center in December. The new four-story library will include instructional labs, group study rooms, and a testing center. The modern, 124,000-sf design by Boston-based Shepley Bulfinch includes space for 500,000 books and study space for up to a thousand students. Sustainable features include geothermal heating and cooling, rainwater harvesting, and low-flow plumbing fixtures.

| Jan 21, 2011

Primate research facility at Duke improves life for lemurs

Dozens of lemurs have new homes in two new facilities at the Duke Lemur Center in Raleigh, N.C. The Releasable Building connects to a 69-acre fenced forest for free-ranging lemurs, while the Semi-Releasable Building is for lemurs with limited-range privileges.

| Jan 21, 2011

Nothing dinky about these residences for Golden Gophers

The Sydney Hall Student Apartments combines 125 student residences with 15,000 sf of retail space in the University of Minnesota’s historic Dinkytown neighborhood, in Minneapolis.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â