flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oklahoma State University’s North Academic Building begins construction

University Buildings

Oklahoma State University’s North Academic Building begins construction

Dewberry designed the project.


By David Malone, Associate Editor | August 5, 2020
OSU North academic building exterior

North Hall will include a bridge to the existing building, and a future link across all buildings for a second floor internal walking path.

The North Academic Building and the Office of the Chief Medical Examiner (ME) at Oklahoma State University’s Center for Health Sciences has started construction. The project will relocate and upgrade services from multiple buildings currently in the center of campus and is the first phase of a master plan focused on health and advancement in research and education.

Initial programming and conceptual design for the building was completed in 2018. Once complete, the ME office will be one of only a few in the country that is directly and physically connected with an academic health center. The ME autopsy lab is unique to Oklahoma and will be among the most technologically advanced in the world specific to advanced postmortem diagnostic imaging.

 

OSU north academic building interiorThe new elevator shaft provides an opportunity to tie the exterior aesthetic to the interior.

 

The new building will also house the Center for Rural Health, Center for Health Systems Innovation, and dedicated anatomy and neuroscience-anatomy laboratories. Additional amenities will include classroom, conference, study, and administration areas.

The project is slated for completion in fall 2022.

 

OSU autopsy labWhen complete, the ME office will be submitted for the National Associate of Medical Examiners (NAME) accreditation, which will rank it among the top ME offices in the nation.

 

Related Stories

| Jul 9, 2014

Harvard Business School to build large-scale conference center

Expected to open in 2018, the facility will combine the elements of a large-scale conference center, a performance space, and an intimate community forum. The new building will be designed by Boston-based William Rawn and Associates.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

Sponsored | | Jul 7, 2014

Channel glass illuminates science at the University of San Francisco

The University of San Francisco’s new John Lo Schiavo Center for Science and Innovation brings science to the forefront of academic life. Its glossy, three-story exterior invites students into the facility, and then flows sleekly down into the hillside where below-grade laboratories and classrooms make efficient use of space on the landlocked campus. 

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Jun 30, 2014

Research finds continued growth of design-build throughout United States

New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery. 

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 16, 2014

6 U.S. cities at the forefront of innovation districts

A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”

| Jun 12, 2014

Tod Williams Billie Tsien Architects' design selected for new UCSC facility

The planned site is a natural landscape among redwood trees with views over Monterey Bay, a site that the architects have called “one of the most beautiful they have ever worked on.”

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

| Jun 11, 2014

5 ways Herman Miller's new office concept rethinks the traditional workplace

Today's technologies allow us to work anywhere. So why come to an office at all? Herman Miller has an answer.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021