flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oklahoma State University’s North Academic Building begins construction

University Buildings

Oklahoma State University’s North Academic Building begins construction

Dewberry designed the project.


By David Malone, Associate Editor | August 5, 2020
OSU North academic building exterior

North Hall will include a bridge to the existing building, and a future link across all buildings for a second floor internal walking path.

The North Academic Building and the Office of the Chief Medical Examiner (ME) at Oklahoma State University’s Center for Health Sciences has started construction. The project will relocate and upgrade services from multiple buildings currently in the center of campus and is the first phase of a master plan focused on health and advancement in research and education.

Initial programming and conceptual design for the building was completed in 2018. Once complete, the ME office will be one of only a few in the country that is directly and physically connected with an academic health center. The ME autopsy lab is unique to Oklahoma and will be among the most technologically advanced in the world specific to advanced postmortem diagnostic imaging.

 

OSU north academic building interiorThe new elevator shaft provides an opportunity to tie the exterior aesthetic to the interior.

 

The new building will also house the Center for Rural Health, Center for Health Systems Innovation, and dedicated anatomy and neuroscience-anatomy laboratories. Additional amenities will include classroom, conference, study, and administration areas.

The project is slated for completion in fall 2022.

 

OSU autopsy labWhen complete, the ME office will be submitted for the National Associate of Medical Examiners (NAME) accreditation, which will rank it among the top ME offices in the nation.

 

Related Stories

| Jul 18, 2014

Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]

“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.

| Jul 18, 2014

Top Construction Management Firms [2014 Giants 300 Report]

Jacobs, Barton Malow, Hill International top Building Design+Construction's 2014 ranking of the largest construction management and project management firms in the United States. 

| Jul 18, 2014

Top Contractors [2014 Giants 300 Report]

Turner, Whiting-Turner, Skanska top Building Design+Construction's 2014 ranking of the largest contractors in the United States. 

| Jul 18, 2014

Engineering firms look to bolster growth through new services, technology [2014 Giants 300 Report]

Following solid revenue growth in 2013, the majority of U.S.-based engineering and engineering/architecture firms expect more of the same this year, according to BD+C’s 2014 Giants 300 report. 

| Jul 18, 2014

Top Engineering/Architecture Firms [2014 Giants 300 Report]

Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.

| Jul 18, 2014

Top Engineering Firms [2014 Giants 300 Report]

Fluor, Arup, Day & Zimmermann top Building Design+Construction's 2014 ranking of the largest engineering firms in the United States.

| Jul 18, 2014

Top Architecture Firms [2014 Giants 300 Report]

Gensler, Perkins+Will, NBBJ top Building Design+Construction's 2014 ranking of the largest architecture firms in the United States. 

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

| Jul 11, 2014

$44.5 million Centennial Hall opens at University of Wisconsin-Eau Claire

Centennial Hall houses the College of Education and Human Sciences and consolidates teacher education. It is the first new academic building on the UW-Eau Claire campus in more than 30 years.

| Jul 10, 2014

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

  DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021