flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Mar 20, 2017

Professional liability insurance rates for architects and engineers expected to be stable in 2017

Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.

Codes and Standards | Mar 15, 2017

Energy Star program at risk

The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.

Codes and Standards | Mar 13, 2017

U.S. House and Senate have voted to repeal Dept. of Laborā€™s 'blacklisting' rule

The rule mandates labor compliance review for federal construction contractors.

Codes and Standards | Mar 9, 2017

WiredScore forms Connectivity Advisory Committee

The committee's creation is an important step forward for the group that evaluates internet connectivity in buildings.

Codes and Standards | Mar 8, 2017

New guide examines multifamily high-performance ventilation

The focus is on cost andĀ performance of various systems.

Codes and Standards | Mar 7, 2017

Canadaā€™s national building codes will encompass effects of climate change

Forecasted data, not historical data, will be used as the basis for the codes.

Codes and Standards | Mar 6, 2017

ConsensusDocs updates standard short contract editions

The updates address industry changes impacting insurance, legal, technology, and terminology.

Codes and Standards | Mar 3, 2017

ASCE updates standard for structures using tensile membrane

The new sstandard combines guidelines for conventional tensile membrane structures with frame-covered membrane structures.

Codes and Standards | Mar 1, 2017

EPA's 2017 Construction General Permit now in effect

The regulation governs compliance with effluent limits.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā