flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Apr 24, 2017

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.

Codes and Standards | Apr 20, 2017

California lawmakers have had little success in attracting sports stadiums

Only one of several attempts has had an impact in recent years.

Codes and Standards | Apr 19, 2017

Dept. of Energy releases updated versions of EnergyPlus and OpenStudio building energy modeling tools

The updated versions include full support for variable speed DX coils, enhanced plant auto-sizing, new fan model, and support for non-rectangular windows.

Codes and Standards | Apr 18, 2017

K-12 school daylighting initiative created to promote best practices

Eneref Institute creates networking group of school administrators for ideas to overcome market obstacles.

Codes and Standards | Apr 17, 2017

OSHA delays enforcing crystalline silica standard in construction industry

Enforcement will begin Sept. 23, three months later than planned. 

Codes and Standards | Apr 13, 2017

Former OSHA official publishes safety citations on his own

Under Trump orders, agency had stopped issuing ‘shaming’ press releases on major fines and safety violations.

Codes and Standards | Apr 12, 2017

Trump infrastructure task force suggests arbitration to speed projects

Permitting process could be reduced from 10 years to 2 years under the proposal.

Codes and Standards | Apr 11, 2017

2017 National Energy Codes Conference includes code boot camp, PNC Tower tour

The DOE-sponsored event will be held in Pittsburgh July 17-20.

Codes and Standards | Apr 10, 2017

Congressional hearing on skills gap includes look at construction industry

Strategies to boost ranks of construction workers include mentoring programs, increased safety measures, trade group support, and outreach to school counselors.

Codes and Standards | Apr 6, 2017

Product-specific EPDs seen as key aid to earning green building credits

The product-specific EPDs allow designers to more quickly earn a LEED v4 credit in the Materials & Resources category.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021