flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Jul 5, 2017

Research study examines tall timber buildings worldwide

Industry group developing criteria for categorizing wide range of construction approaches to tall timber buildings.

Codes and Standards | Jun 30, 2017

AAMA releases new document on aluminum fenestration and energy efficiency

The free download addresses entrances, storefront framing, curtain walls, windows and skylight fenestration systems.

Codes and Standards | Jun 29, 2017

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.

Codes and Standards | Jun 28, 2017

Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Standards ASCE/SEI 7-16, has been updated

The document is used for determining design loads including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, earthquake, wind, and fire.

Codes and Standards | Jun 27, 2017

Cold-formed steel framing engineering guide for building projects released

Better sound attenuation for subfloors and exterior continuous insulation are among the matters addressed.

Codes and Standards | Jun 26, 2017

L.A.’s new ordinance requires energy and water efficiency benchmarking

Structures 20,000 sf and larger must demonstrate steps to boost efficiency.

Codes and Standards | Jun 21, 2017

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Building efficiency essential to tempering global climate change.

Codes and Standards | Jun 21, 2017

Senate bill would prohibit tax money for sports stadium projects

Bipartisan legislation would prevent use of municipal bonds by pro teams.

Codes and Standards | Jun 19, 2017

Developer, architect hit with $10 million construction defect verdict

Case pertained to construction of condo development that was not fire code-compliant.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021