flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Jan 9, 2017

New LEED for Cities, LEED for Communities pilot certifications unveiled

Requires tracking of performance data and progress toward goals. 

Codes and Standards | Jan 9, 2017

China claims top ranking outside of U.S. for total LEED-certified space

Canada, India, Brazil, and Korea round out top 5.

Codes and Standards | Jan 6, 2017

OSHA prompts more proactive approach to construction site safety

Remote operated camera systems are being used to mitigate risk in real time.

Codes and Standards | Jan 5, 2017

2018 building energy code upholds efficiency gains

Efforts to scale back efficiency requirements largely defeated.

Codes and Standards | Jan 4, 2017

Low-income housing doesn’t lower neighborhood housing values

A Trulia study contradicts longstanding fears.

Codes and Standards | Jan 3, 2017

Intelligent transportation systems have implications for designers, construction firms

Sensors and Internet of Things devices will have to be embedded in infrastructure.

Codes and Standards | Dec 15, 2016

OSHA releases safety recommendation guide for construction industry

It is said to be most helpful to small and mid-sized contractors.

Codes and Standards | Dec 14, 2016

Cities must invest $375 billion to avoid catastrophic global climate change

C40 Cities Climate Leadership Group advocates low carbon infrastructure.

Codes and Standards | Dec 14, 2016

Resilient construction techniques pay for themselves over lifetime of buildings

Spending $340,000 for resiliency would pay for itself over the lifetime of a $10 million structure.

Codes and Standards | Dec 12, 2016

Dept. of Energy launches program to advance zero energy school design

Six school districts and two states are among the first to mainstream zero energy schools.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021