flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Jun 5, 2018

Sports stadiums and arenas showcase sustainability features

Green venues save owners money, gain positive publicity.

Codes and Standards | Jun 4, 2018

L.A. must transition to cleaner energy, boost transit to reach sustainability goals

City aims to reduce GHGs 60% by 2035 and 80% by 2050.

Codes and Standards | Jun 4, 2018

Washington D.C.’s flattened skyline can be a virtue

Zoning ordinance that ties building heights to width of streets dictates form.

Codes and Standards | May 30, 2018

Silicon Valley cities considering taxes aimed at large employers

The aim is to offset the impact on housing costs and homelessness by tech companies.

Codes and Standards | May 30, 2018

OSHA proposes new crane operator safety rule

Would provide long-term clarity on certification requirements.

Codes and Standards | May 29, 2018

Government support helping to drive demand for green building materials

Market projects to grow 12.5% annually between 2013 and 2019.

Codes and Standards | May 24, 2018

‘Amazon tax’ could slow Seattle’s construction boom

City imposes employer head count tax to fund affordable housing.

Codes and Standards | May 23, 2018

AAMA releases 2017/2018 fenestration market studies

Offers forecasts of industry trends.

Codes and Standards | May 22, 2018

Registration open for 2018 National Energy Codes Conference

U.S. Department of Energy event to be held July 15th-17th in Austin.

Codes and Standards | May 21, 2018

New standard tests quietness of floors

ASTM International method will help manufacturers test their flooring materials.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021