flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Jul 10, 2018

Carbon emissions in cement production threaten GHG reduction goals

Cement is essential to many infrastructure projects that address climate change.

Codes and Standards | Jul 10, 2018

DOE’s Better Buildings Summit to be held in Cleveland, August 21-23

Agenda includes technical training and networking opportunities.

Codes and Standards | Jul 6, 2018

Delos and HDR will co-develop wellness design tools and collaborate on research

WELL Building Standard pioneer teams with architects to advance wellness innovations in the built environment.

Codes and Standards | Jul 5, 2018

BREEAM New Construction standard launched in U.S.

Follows successful launch of BREEAM In-Use standard.

Codes and Standards | Jun 29, 2018

Nearly half of nonresidential construction projects now delivered by design-build

‘Alternative’ method now mainstream for nonresidential, highway/street, and water/wastewater construction projects.

Codes and Standards | Jun 28, 2018

Modular construction may be key to relieving housing crunch

May be only way to meet needs as ranks of construction workers decline.

Codes and Standards | Jun 27, 2018

Thirty nine San Francisco high rises at risk of collapse in major earthquake

Vulnerable buildings have welded columns and beams.

Codes and Standards | Jun 26, 2018

Boston enacts new climate resiliency rules for buildings

New policy is likely a first in the nation.

Codes and Standards | Jun 25, 2018

Integrated Project Delivery guide offered by Pankow Foundation

An Action Guide for Leaders offers answers to critical IPD questions.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021