flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Apr 11, 2018

Urgent need for government to make communities, infrastructure more resilient

More than 350 people died from extreme weather events in 2017.

Codes and Standards | Apr 10, 2018

Boosting energy efficiency helps reduce health risks

Cleaner air results in fewer heart attacks, respiratory disease, and premature deaths.

Codes and Standards | Apr 9, 2018

U.K. business leaders call for zero-carbon buildings by 2030

Real estate, construction industry executives among those supporting the goal.

Codes and Standards | Apr 4, 2018

New ASTM standard supports stucco use in construction

Provides way to measure tensile strength in vertical applications.

Codes and Standards | Apr 3, 2018

LEED v4.1 O+M for Existing Buildings available for beta testing

Update said to be most inclusive and transparent platform to date.

Codes and Standards | Apr 2, 2018

Experts chosen for ICC, ANCR buildings resilience benchmarks project

Specialists to focus on community preparedness for disasters.

Codes and Standards | Mar 29, 2018

Contractors have paid $5.2 million for failing local resident employee mandate on Detroit arena

Companies were only able to meet half of the 51% local worker requirement over course of the project.

Codes and Standards | Mar 28, 2018

Washington State moving to promote mass timber construction with legislation

Bill would require all 12-story or less public buildings to be built with mass timber.

Codes and Standards | Mar 27, 2018

Los Angeles appoints its first chief design officer

Responsibility for enhancing civic architecture and urban design.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021