flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This new high school is the first to be built on a tech company’s campus

K-12 Schools

This new high school is the first to be built on a tech company’s campus

Design Tech High School, located on Oracle Corporation’s Headquarters campus, will span 64,000 sf across two stories and have a capacity of 550 students.


By David Malone, Associate Editor | August 1, 2017
A rendering of Design Tech High School's outdoor terraces, glassy facade, and public paths

Rendering courtesy of DES Architects + Engineers

Oracle Corporation’s Redwood Shores Headquarters is in the process of receiving a new addition the likes of which a tech company campus has never seen before; a high school.

Design Tech High School (d.tech) will be the first high school in the country located on a tech company’s campus. The 64,000-sf, two-story building has a fabrication lab designed as the heart of the new facility. The two-story lab, called the Design Realization Garage, will house heavy fabrication on the first floor and digital prototyping on the second floor. An internal elevator will move projects between the two spaces.

Modular learning neighborhoods are located on the east and west wings of the building and feature four interconnected classrooms that utilize movable partitions and furniture. Collaboration spaces are incorporated along the main circulation corridors of the building. These corridors, dubbed the California Corridors, provide unobstructed views of San Francisco Bay and the surrounding shoreline. Three enclosed outdoor spaces on the ground level and two rooftop decks provide outdoor settings for education.

 

A rendering of the entrance at Design Tech High School, designed by DES Architects + EngineersRendering courtesy of DES Architects + Engineers.

 

Oracle is providing the land and building the facility, but the school will be a fully autonomous public high school. The Oracle Conference Center and the main pedestrian promenade on campus connect directly to d.tech’s entrance. The Conference Center will provide a venue for the school’s large gatherings and performances. The existing Oracle kitchen will provide food for the students and the company’s fitness center will be utilized part-time for d.tech’s physical education programs.

As part of the project, existing community trails will be improved and new segments will be added to the San Francisco Bay Trail. Nearly two new acres of improved outdoor space will be available for the public.

Design Tech High School is targeting LEED for Schools Gold and is currently under construction. The DES Architects + Engineers-designed facility is scheduled to open in January 2018.

Related Stories

| Aug 11, 2010

JE Dunn, Balfour Beatty among country's biggest institutional building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Institutional Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gilbane, Manhattan Construction top BD+C's ranking of the nation's 50 largest K-12 school contractors

A ranking of the Top 50 K-12 School Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report

A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021