flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This new high school is the first to be built on a tech company’s campus

K-12 Schools

This new high school is the first to be built on a tech company’s campus

Design Tech High School, located on Oracle Corporation’s Headquarters campus, will span 64,000 sf across two stories and have a capacity of 550 students.


By David Malone, Associate Editor | August 1, 2017
A rendering of Design Tech High School's outdoor terraces, glassy facade, and public paths

Rendering courtesy of DES Architects + Engineers

Oracle Corporation’s Redwood Shores Headquarters is in the process of receiving a new addition the likes of which a tech company campus has never seen before; a high school.

Design Tech High School (d.tech) will be the first high school in the country located on a tech company’s campus. The 64,000-sf, two-story building has a fabrication lab designed as the heart of the new facility. The two-story lab, called the Design Realization Garage, will house heavy fabrication on the first floor and digital prototyping on the second floor. An internal elevator will move projects between the two spaces.

Modular learning neighborhoods are located on the east and west wings of the building and feature four interconnected classrooms that utilize movable partitions and furniture. Collaboration spaces are incorporated along the main circulation corridors of the building. These corridors, dubbed the California Corridors, provide unobstructed views of San Francisco Bay and the surrounding shoreline. Three enclosed outdoor spaces on the ground level and two rooftop decks provide outdoor settings for education.

 

A rendering of the entrance at Design Tech High School, designed by DES Architects + EngineersRendering courtesy of DES Architects + Engineers.

 

Oracle is providing the land and building the facility, but the school will be a fully autonomous public high school. The Oracle Conference Center and the main pedestrian promenade on campus connect directly to d.tech’s entrance. The Conference Center will provide a venue for the school’s large gatherings and performances. The existing Oracle kitchen will provide food for the students and the company’s fitness center will be utilized part-time for d.tech’s physical education programs.

As part of the project, existing community trails will be improved and new segments will be added to the San Francisco Bay Trail. Nearly two new acres of improved outdoor space will be available for the public.

Design Tech High School is targeting LEED for Schools Gold and is currently under construction. The DES Architects + Engineers-designed facility is scheduled to open in January 2018.

Related Stories

| Oct 22, 2012

Two-Hour Curtain Wall Lets Light In and Keeps Fire Out at Prairie Hills Junior High School

New school’s south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing.

| Sep 7, 2012

Net-zero energy pioneers on the el-hi frontier

Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.

| Sep 7, 2012

The keys to success in the K-12 school market

When educators and school administrators describe their vision for new K-12 school buildings as ‘21st-century learning spaces,’ they’re not exaggerating. Many new schools are truly different in concept from their counterparts of only a few years ago.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

| Jul 2, 2012

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021