flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New health sciences center at St. John’s University will feature geothermal heating, cooling

University Buildings

New health sciences center at St. John’s University will feature geothermal heating, cooling

Flexible room layouts will accommodate multiple teaching and learning styles at the St. Vincent Health Sciences Center at St. John’s University.


By Peter Fabris, Contributing Editor  | May 5, 2023
St. Vincent Health Sciences Center at St. John’s University will feature geothermal heating, cooling
Rendering courtesy CannonDesign

The recently topped off St. Vincent Health Sciences Center at St. John’s University in New York City will feature impressive green features, including geothermal heating and cooling and an array of rooftop solar panels. The geothermal field consists of 66 wells drilled 499 feet below ground which will help to heat and cool the 70,000-sf structure.
 
High-performance, energy-efficient windows will reduce thermal loss. The elongated east-west floor plan of the building will maximize daylight, and skylights will help reduce artificial lighting usage by 22% during daylight hours. State-of-the-art building control systems will optimize lighting, space occupancy, and temperature throughout the building. The facility is projected to be one of the greenest buildings on campus.
 
The bright, sun-splashed Dorethea and Nickolas Davatzes Atrium will welcome visitors as they enter from the Great Lawn. The center will feature state-of-the-art classrooms, cutting-edge laboratories, patient simulation facilities, and transformative virtual reality technology to support real-world clinical training that is redefining what is possible in the healthcare industry, according Shawmut Design and Construction, the project's construction manager.
 
When complete, the building will feature collaborative spaces, outdoor terraces, and attractive vistas to become a hub for generations of caregivers, healthcare professionals, and individuals who are committed to improving the lives of others. The facility is scheduled to open in 2024.
 
Owner and/or developer: St. John’s University
Design architect: CannonDesign
MEP engineer: CannonDesign
Structural engineer: CannonDesign
Construction manager: Shawmut Design and Construction

St. Vincent Health Sciences Center at St. John’s University in New York City
Rendering courtesy CannonDesign

Related Stories

University Buildings | Dec 17, 2019

Two LMN Architects-designed academic science buildings move forward for completion next year

These facilities will bring several disciplines under one roof.

University Buildings | Dec 12, 2019

HOK will design the Florida Gators new football facility

The facility will be named after longtime donor to the University of Florida and the University Athletic Association James W. “Bill” Heavener.

Wood | Dec 6, 2019

The University of Arkansas is now home to America’s largest mass timber building

A design collaborative led by Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN designed the project.

University Buildings | Nov 1, 2019

Design unveiled for the University of Maryland’s School of Public Policy building

LEO A DALY, in association with VJAA, designed the building.

University Buildings | Oct 28, 2019

Eight projects showcase the latest trends in student housing

Join us on a tour of select student residences at some of America’s top four-year colleges and universities.

University Buildings | Sep 30, 2019

UMass Amherst’s Worcester Commons to be built on an existing parking lot

Shawmut, in partnership with Perry Dean Rogers and Connor Architecture, are designing the project.

University Buildings | Sep 23, 2019

Engineering Innovation Hub completes on SUNY New Paltz campus

Urbahn Architects designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021