Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation. 


By Peter Fabris, Contributing Editor | July 27, 2015
New guide for installation of mineral fiber pipe insulation on chilled water systems

Photo: Steve Jurvetson, Creative Commons

The North American Insulation Manufacturers Association (NAIMA) has issued a new publication, “Guide to Insulating Chilled Water Piping Systems With Mineral Fiber Pipe Insulation.” 

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation.

"Insulation systems are critical to limiting heat losses and preventing condensation on pipe surfaces operating from 33 degrees F to 60 degrees F (0.5 degrees C to 15.6 degrees C) within conditioned spaces in commercial and institutional buildings," says Charles Cottrell, vice president technical services for NAIMA. "When poorly applied, however, an insulation system can compromise insulation effectiveness.” 

“NAIMA developed this step-by-step guide for applying vapor-sealed mineral fiber pipe insulation, which when installed according to the guide's recommendations, can effectively control condensation, help extend the life of the insulation system, and save energy," Cottrell says.

The guide addresses the installation of standard ASJ jacketed pipe insulation and presents recommendations based on reliable engineering principles and research, as well as consultation with manufacturers, contractors, and industry experts.

It details insulation application on straight pipe; on pipe system fittings including flanges, couplings, elbows, tees, and valves; and on 45- and 90-degree elbows.  Also included are details on vapor dams, pipe supports, and field-applied jackets.

Other sections include performance criteria, a guide specification, and installation checklist. Click here to download a free copy of the guide.

Related Stories

Codes and Standards | Jan 7, 2021

Workers on some of Virginia’s major construction projects sue subcontractors for wage theft

Projects include new General Assembly Building, outpatient facility at Virginia Commonwealth University.

Codes and Standards | Jan 5, 2021

EPA finalizes first major update to Lead and Copper rule

Will accelerate pace of lead service line replacement.

Codes and Standards | Jan 5, 2021

Flood risk for affordable housing expected to triple by 2050

Some communities will have 90% of their affordable housing at risk.

Codes and Standards | Jan 4, 2021

Ranks of remote workers expected to double in five years

Nearly 23% of employees will work from outside of offices.

Codes and Standards | Dec 28, 2020

CSI and ASTM standards can now be connected through a central location

CROSSWALK web service accesses standards specific to projects from feasibility to turnover.

Codes and Standards | Dec 28, 2020

Dept. of Energy offers Better Buildings Field Validation Results Hub

One-stop-shop for information associated with technology validations in buildings.

Codes and Standards | Dec 28, 2020

2021 Defense Authorization Act includes mass timber provision

Directs defense, agriculture secretaries to review potential for wood frame construction on defense building projects.

Codes and Standards | Dec 28, 2020

New York City proposal would require rainwater detention tanks for new development

Rule would apply to projects on lots sized 20,000 sf or larger.

Codes and Standards | Dec 17, 2020

Energy efficiency as a service gaining ground as financing approach for adopting innovations

Building owners can invest in new technology with no upfront cost.

Codes and Standards | Dec 16, 2020

Resources available to address Legionella threat

Buildings reopened after extended pandemic closure are at risk.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021