flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New guide for installation of mineral fiber pipe insulation on chilled water systems

Codes and Standards

New guide for installation of mineral fiber pipe insulation on chilled water systems

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation. 


By Peter Fabris, Contributing Editor | July 27, 2015
New guide for installation of mineral fiber pipe insulation on chilled water systems

Photo: Steve Jurvetson, Creative Commons

The North American Insulation Manufacturers Association (NAIMA) has issued a new publication, “Guide to Insulating Chilled Water Piping Systems With Mineral Fiber Pipe Insulation.” 

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation.

"Insulation systems are critical to limiting heat losses and preventing condensation on pipe surfaces operating from 33 degrees F to 60 degrees F (0.5 degrees C to 15.6 degrees C) within conditioned spaces in commercial and institutional buildings," says Charles Cottrell, vice president technical services for NAIMA. "When poorly applied, however, an insulation system can compromise insulation effectiveness.” 

“NAIMA developed this step-by-step guide for applying vapor-sealed mineral fiber pipe insulation, which when installed according to the guide's recommendations, can effectively control condensation, help extend the life of the insulation system, and save energy," Cottrell says.

The guide addresses the installation of standard ASJ jacketed pipe insulation and presents recommendations based on reliable engineering principles and research, as well as consultation with manufacturers, contractors, and industry experts.

It details insulation application on straight pipe; on pipe system fittings including flanges, couplings, elbows, tees, and valves; and on 45- and 90-degree elbows.  Also included are details on vapor dams, pipe supports, and field-applied jackets.

Other sections include performance criteria, a guide specification, and installation checklist. Click here to download a free copy of the guide.

Related Stories

Codes and Standards | Jan 19, 2021

2021 Solar Investment Tax Credit will remain at 26%

Incentive was scheduled to be reduced to 22%.

Codes and Standards | Jan 19, 2021

Thomas Jefferson University launches the Institute for Smart and Healthy Cities

Will address climate change, social equity, rapid urbanization, and health.

Codes and Standards | Jan 14, 2021

Petition urges FEMA to update flood maps, set tougher standards for floodplain construction

Environmental and planning groups note soaring claims, flood insurance debt.

Codes and Standards | Jan 13, 2021

Proposed change to IECC process irks efficiency advocates

New procedure would diminish influence of local code officials.

Codes and Standards | Jan 12, 2021

Two net-zero hotel projects could portend a new hospitality trend

Energy-intensive sector comprises 10% of all commercial real estate.

Codes and Standards | Jan 11, 2021

Zero Energy Buildings growth driven by government policy, stringent codes, technologies

Restraints include high upfront cost, and lack of universal definition and approaches.

Codes and Standards | Jan 11, 2021

HUD releases new Fair Housing Act design and construction requirements

First update of ‘safe harbors’ in 15 years provides better clarity for design and construction firms.

Codes and Standards | Jan 8, 2021

Court ruling gives UpCodes upper hand in fight over building codes database

Battle over IP property claims by ICC and other codes bodies continues.

Codes and Standards | Jan 8, 2021

Houston creates tax incentives for green stormwater elements

Businesses that install green roofs, rain gardens, permeable pavement, and rainwater harvesting are eligible.

Codes and Standards | Jan 7, 2021

Trump’s classical design aesthetic mandate for federal buildings likely to be felt for years

May limit the number of firms that could compete for contracts.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021