flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New guide for installation of mineral fiber pipe insulation on chilled water systems

Codes and Standards

New guide for installation of mineral fiber pipe insulation on chilled water systems

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation. 


By Peter Fabris, Contributing Editor | July 27, 2015
New guide for installation of mineral fiber pipe insulation on chilled water systems

Photo: Steve Jurvetson, Creative Commons

The North American Insulation Manufacturers Association (NAIMA) has issued a new publication, “Guide to Insulating Chilled Water Piping Systems With Mineral Fiber Pipe Insulation.” 

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation.

"Insulation systems are critical to limiting heat losses and preventing condensation on pipe surfaces operating from 33 degrees F to 60 degrees F (0.5 degrees C to 15.6 degrees C) within conditioned spaces in commercial and institutional buildings," says Charles Cottrell, vice president technical services for NAIMA. "When poorly applied, however, an insulation system can compromise insulation effectiveness.” 

“NAIMA developed this step-by-step guide for applying vapor-sealed mineral fiber pipe insulation, which when installed according to the guide's recommendations, can effectively control condensation, help extend the life of the insulation system, and save energy," Cottrell says.

The guide addresses the installation of standard ASJ jacketed pipe insulation and presents recommendations based on reliable engineering principles and research, as well as consultation with manufacturers, contractors, and industry experts.

It details insulation application on straight pipe; on pipe system fittings including flanges, couplings, elbows, tees, and valves; and on 45- and 90-degree elbows.  Also included are details on vapor dams, pipe supports, and field-applied jackets.

Other sections include performance criteria, a guide specification, and installation checklist. Click here to download a free copy of the guide.

Related Stories

Codes and Standards | Oct 19, 2020

NEXT Coalition chooses five pilot projects to fight COVID-19 on jobsites

Mobile platforms, wearable sensors, AI video systems among the trial solutions.

Codes and Standards | Oct 15, 2020

Neighborhoods Now offers cost-effective, DIY designs in response to COVID-19 pandemic

Designs include barriers for outdoor dining, sidewalk retail displays, and modular seating for public spaces.

Codes and Standards | Oct 14, 2020

Standard contract document for prefab and modular building released

ConsensusDocs addresses the most common prefabricated construction use-case scenario.

Codes and Standards | Oct 13, 2020

Austin is first major Texas city to adopt wildfire code

New ordinance based on the International Wildland-Urban Interface Code.

Codes and Standards | Oct 12, 2020

Guidance offered for K-12 schools to support students with asthma

Green purchasing policies for cleaning, filters, furniture and other products encouraged.

Codes and Standards | Oct 7, 2020

More energy efficiency programs are encouraging zero-energy projects

At least 20 programs for new construction, major renovations emerge.

Codes and Standards | Oct 6, 2020

LEED, GBCI rating systems spur resilience-enhancing strategies

Expanded programs, resources address impact of climate change.

Codes and Standards | Oct 6, 2020

International Code Council to hold inaugural online education event

Week-long ICC Learn Live will include panel conversations, keynotes, and breakout sessions around key topics in building safety.

Codes and Standards | Oct 5, 2020

Guides addressing fenestration anchorage updated

First update to decade-old technical documents released.

Codes and Standards | Oct 1, 2020

Deadline extension for LEED 2009 project certifications

Delivery timeline delays due to COVID-19 pandemic prompt action.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021