WE3 at Water’s Edge, a six-story, 160,000-sf creative workspace has completed construction in an area of Playa Vista colloquially referred to as “Silicon Beach.”
WE3 is the third and final building in a pre-existing commercial campus. SPF:architects’ main challenge with the project was to create a plan fully integrated with the existing conditions that would maximize the lot’s buildable area and maintain a compelling architectural standard. The project evolved over time to create a longer, more flexible office space that allowed more light and views on each elevation. A new public courtyard was created and an existing on grade sports field was relocated over the parking substructure.
The 400-foot-long building includes four levels of parking (two subterranean, one at grade, and one above grade) and four floors of open workspace. Each of the four levels is approximately 40,000-sf and fifteen feet floor to floor.
WE3 at Water's Edge - SPF:architects from SPF:architects on Vimeo.
Due to zoning restrictions, the building’s top floor could not be contiguous and exceed 20,000 sf. In order to maintain the desired area requirements, a gap was introduced mid-floor and a sky garden was created. The sky garden is located approximately 70 feet above natural grade and provides views toward Baldwin Hills and the Pacific Ocean. It also provides tenants with a wind-shielded terrace that can be used for impromptu meetings or casual workspaces. Additionally, all circulation and exiting is designed to be exterior.
WE3’s exterior includes a “floating,” perforated skin that shrouds the building and dematerializes it, visually lengthening the structure’s significant mass while providing the glass facade cover from the full brunt of the sun. Natural light filters through the skin in all directions and is proportionally spread across the entirety of the interior surface area.
Related Stories
Office Buildings | Feb 1, 2021
609 W. Randolph begins construction in Chicago’s West Loop Gate
Antunovich Associates designed the project.
Office Buildings | Jan 19, 2021
Anchorage to receive new glacier-inspired office building
Perkins&Will is designing the building.
Office Buildings | Jan 12, 2021
Epic Games purchases North Carolina mall to convert into new HQ
The video game company is currently valued at over $17 billion thanks to Fortnite, its massively popular battle royale game.
Architects | Jan 5, 2021
Ware Malcomb finds itself in the mix for multiple diverse projects
Its latest completion is an office/factory/warehouse combo for one of Marvin Window’s brands.
Giants 400 | Dec 16, 2020
Download a PDF of all 2020 Giants 400 Rankings
This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.
Giants 400 | Dec 3, 2020
2020 Office Sector Giants: Top architecture, engineering, and construction firms in the U.S. office building sector
Gensler, Jacobs, and STO Building Group head BD+C's rankings of the nation's largest office building sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.
Government Buildings | Nov 25, 2020
New Indiana Toll Road headquarters creates unified environment for staff
New LEED Gold facility consolidates operations for tollway authority.
Smart Buildings | Nov 20, 2020
The Weekly show: SPIRE smart building rating system, and pickleball court design tips
The November 19 episode of BD+C's The Weekly is available for viewing on demand.