WE3 at Water’s Edge, a six-story, 160,000-sf creative workspace has completed construction in an area of Playa Vista colloquially referred to as “Silicon Beach.”
WE3 is the third and final building in a pre-existing commercial campus. SPF:architects’ main challenge with the project was to create a plan fully integrated with the existing conditions that would maximize the lot’s buildable area and maintain a compelling architectural standard. The project evolved over time to create a longer, more flexible office space that allowed more light and views on each elevation. A new public courtyard was created and an existing on grade sports field was relocated over the parking substructure.
The 400-foot-long building includes four levels of parking (two subterranean, one at grade, and one above grade) and four floors of open workspace. Each of the four levels is approximately 40,000-sf and fifteen feet floor to floor.
WE3 at Water's Edge - SPF:architects from SPF:architects on Vimeo.
Due to zoning restrictions, the building’s top floor could not be contiguous and exceed 20,000 sf. In order to maintain the desired area requirements, a gap was introduced mid-floor and a sky garden was created. The sky garden is located approximately 70 feet above natural grade and provides views toward Baldwin Hills and the Pacific Ocean. It also provides tenants with a wind-shielded terrace that can be used for impromptu meetings or casual workspaces. Additionally, all circulation and exiting is designed to be exterior.
WE3’s exterior includes a “floating,” perforated skin that shrouds the building and dematerializes it, visually lengthening the structure’s significant mass while providing the glass facade cover from the full brunt of the sun. Natural light filters through the skin in all directions and is proportionally spread across the entirety of the interior surface area.
Related Stories
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.
Office Buildings | Aug 8, 2024
6 design trends for the legal workplace
Law firms differ from many professional organizations in their need for private offices to meet confidentiality with clients and write and review legal documents in quiet, focused environments
High-rise Construction | Jul 29, 2024
Safdie Architects’ Shanghai office tower features glass-enclosed corner garden that ascends the 35-story structure
Safdie Architects has announced the completion of LuOne Mixed-Use Complex—a business, retail, and entertainment development in the Luwan district of Shanghai, China. The mixed-use complex consists of an eight-level retail galleria, which opened in 2018, and a 35-story office tower, which recently reached completion.
Smart Buildings | Jul 25, 2024
A Swiss startup devises an intelligent photovoltaic façade that tracks and moves with the sun
Zurich Soft Robotics says Solskin can reduce building energy consumption by up to 80% while producing up to 40% more electricity than comparable façade systems.
Great Solutions | Jul 23, 2024
41 Great Solutions for architects, engineers, and contractors
AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.
Office Buildings | Jul 22, 2024
U.S. commercial foreclosures increased 48% in June from last year
The commercial building sector continues to be under financial pressure as foreclosures nationwide increased 48% in June compared to June 2023, according to ATTOM, a real estate data analysis firm.
Sponsored | Office Buildings | Jul 17, 2024
Unlocking Sustainability: Smart Access in the Coworking Space
Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover how choosing the right partners can amplify your green efforts.
Adaptive Reuse | Jul 12, 2024
Detroit’s Michigan Central Station, centerpiece of innovation hub, opens
The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.
Government Buildings | Jul 8, 2024
GSA adopts new accessibility guidelines for federal properties
The U.S. General Services Administration (GSA) adopted a new rule with new accessibility guidelines for federal buildings. The rule establishes that pedestrian facilities in the public right-of-way are readily accessible to and usable by people with disabilities.
Office Buildings | Jul 8, 2024
Office vacancy peak of 22% to 28% forecasted for 2026
The work from home trend will continue to put pressure on the office real estate market, with peak vacancy of between 22% and 28% in 2026, according to a forecast by Moody’s.