flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New creative office space completes in Silicon Beach

Office Buildings

New creative office space completes in Silicon Beach

SPF:architects designed the project.


By David Malone, Associate Editor | January 27, 2021

All photos courtesy SPF:architects.

WE3 at Water’s Edge, a six-story, 160,000-sf creative workspace has completed construction in an area of Playa Vista colloquially referred to as “Silicon Beach.”

WE3 is the third and final building in a pre-existing commercial campus. SPF:architects’ main challenge with the project was to create a plan fully integrated with the existing conditions that would maximize the lot’s buildable area and maintain a compelling architectural standard. The project evolved over time to create a longer, more flexible office space that allowed more light and views on each elevation. A new public courtyard was created and an existing on grade sports field was relocated over the parking substructure.

 

WE3 exterior view

 

The 400-foot-long building includes four levels of parking (two subterranean, one at grade, and one above grade) and four floors of open workspace. Each of the four levels is approximately 40,000-sf and fifteen feet floor to floor. 

 

WE3 at Water's Edge - SPF:architects from SPF:architects on Vimeo.

 

Due to zoning restrictions, the building’s top floor could not be contiguous and exceed 20,000 sf. In order to maintain the desired area requirements, a gap was introduced mid-floor and a sky garden was created. The sky garden is located approximately 70 feet above natural grade and provides views toward Baldwin Hills and the Pacific Ocean. It also provides tenants with a wind-shielded terrace that can be used for impromptu meetings or casual workspaces. Additionally, all circulation and exiting is designed to be exterior.

WE3’s exterior includes a “floating,” perforated skin that shrouds the building and dematerializes it, visually lengthening the structure’s significant mass while providing the glass facade cover from the full brunt of the sun. Natural light filters through the skin in all directions and is proportionally spread across the entirety of the interior surface area.

 

WE3 exterior space

 

WE3 circulation space

 

WE3 exterior

Related Stories

Office Buildings | Jun 10, 2021

The future of the workplace is social clubs

Office design experts from NELSON Worldwide propose a new concept for the workplace, one that resembles the social clubs of the past. 

Office Buildings | Jun 8, 2021

RMJM Milano wins competition to design Sanko Headquarters in Istanbul, Turkey

The project was selected for its sustainable and innovative features.

Office Buildings | Jun 3, 2021

What's next for workplace design?

Balancing personal space and the need for collaboration.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Office Buildings | May 18, 2021

“The Beam” will be Arizona’s first CLT project

RSP Architects designed the building.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Steel Buildings | Apr 17, 2021

Speed Core wall system is used for the second time in office building in San Jose

The construction method is expected to knock off three months from the project’s schedule.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021