flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multipurpose sports facility will be first completed building at Obama Presidential Center

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

Located in Chicago’s Jackson Park, the 45,000-sf multipurpose sports facility and events space features a regulation-size NBA basketball court. The facility’s design is inspired by two of President Obama’s passions: basketball and community building.


By Novid Parsi, Contributing Editor  | April 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
Rendering: Obama Foundation

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. 

Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan. Elevate Design Builders, a joint firm led by Bowa Construction and AECOM Hunt, is the builder.

The Home Court features a regulation-size NBA basketball court with intersecting practice courts, flexible seating, fitness equipment, and training spaces. A mezzanine level provides additional seating for an intimate spectator experience. Home Court also offers multipurpose spaces for community activities.

The Home Court’s design is inspired by two of President Obama’s passions: basketball and community building. The sleek metal and glass panel exterior has been patterned to evoke a basketball net and community connection. The expansive, east-facing glass façade—fritted to protect birds by keeping them from striking it—will offer views of the campus.

“From the outset, President Obama knew he wanted our Home Court to be a place where people could come for fun, inspiration, and learning—the kind of community spaces we need in an inclusive democracy,” Obama Foundation CEO Valerie Jarrett said in a statement. “We intend for it to be an extraordinary resource to our community that will allow families to improve their health and wellness, and participate in educational and career readiness programming all in hopes of building a brighter, healthier future.”  

The design aligns with the Obama Foundation’s sustainability goals for the campus. The two-story lobby will provide natural light for many of the building’s interior spaces. Like the rest of the campus, the Home Court will be heated and cooled mostly with geothermal energy, part of the campus-wide strategy to avoid using fossil fuels.

Rendering: Obama Foundation
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation

 

Related Stories

Cultural Facilities | May 17, 2019

Mulva Cultural Center builds upon city's arts legacy

Former ConocoPhillips CEO and wife have donated millions for culture and education.

Cultural Facilities | Mar 25, 2019

The new Olympic House in Switzerland will reflect the international governing body’s values

The building, nestled in a large park, is striving to meet three different sustainability standards.

Libraries | Feb 10, 2019

New library branch in San Diego opens with its community’s learning and working traits in mind

It features larger gathering spaces and more technology than its predecessor.

Libraries | Jan 18, 2019

Chicago’s newest library branch preserves the old and ushers in the new

Its exterior design reflects the neighborhood’s industrial history, while its interior fosters community and shared learning.

Cultural Facilities | Oct 24, 2018

San Antonio approves redevelopment of Alamo Plaza

The San Antonio City Council voted 9-2 in favor of the makeover.

Cultural Facilities | Aug 10, 2018

Moviegoers are looking for an ‘intimate experience’

Comfort and service are keys to attracting repeat customers, says an expert whose firm specializes in cinema design.

Cultural Facilities | Jun 11, 2018

Risorgimento, Buffalo style

Further evidence of the positive impact of the cultural centers on neighborhood development and economic growth can be found in Buffalo, N.Y., where plans for the Italian Cultural Center are moving forward.

Cultural Facilities | Jun 11, 2018

Cultural centers: Community-based venues can be catalysts for downtown renewal

New cultural centers have sparked development in the form of new offices, restaurants, retail, hotels, business incubators, apartments, and arenas.

Cultural Facilities | Jun 2, 2018

Topping Off: Pikes Peak is getting a new Summit Complex

The 26,000-sf facility will be green, resilient, and emphasize the view rather than the architecture.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021