flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multipurpose sports facility will be first completed building at Obama Presidential Center

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

Located in Chicago’s Jackson Park, the 45,000-sf multipurpose sports facility and events space features a regulation-size NBA basketball court. The facility’s design is inspired by two of President Obama’s passions: basketball and community building.


By Novid Parsi, Contributing Editor  | April 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
Rendering: Obama Foundation

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. 

Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan. Elevate Design Builders, a joint firm led by Bowa Construction and AECOM Hunt, is the builder.

The Home Court features a regulation-size NBA basketball court with intersecting practice courts, flexible seating, fitness equipment, and training spaces. A mezzanine level provides additional seating for an intimate spectator experience. Home Court also offers multipurpose spaces for community activities.

The Home Court’s design is inspired by two of President Obama’s passions: basketball and community building. The sleek metal and glass panel exterior has been patterned to evoke a basketball net and community connection. The expansive, east-facing glass façade—fritted to protect birds by keeping them from striking it—will offer views of the campus.

“From the outset, President Obama knew he wanted our Home Court to be a place where people could come for fun, inspiration, and learning—the kind of community spaces we need in an inclusive democracy,” Obama Foundation CEO Valerie Jarrett said in a statement. “We intend for it to be an extraordinary resource to our community that will allow families to improve their health and wellness, and participate in educational and career readiness programming all in hopes of building a brighter, healthier future.”  

The design aligns with the Obama Foundation’s sustainability goals for the campus. The two-story lobby will provide natural light for many of the building’s interior spaces. Like the rest of the campus, the Home Court will be heated and cooled mostly with geothermal energy, part of the campus-wide strategy to avoid using fossil fuels.

Rendering: Obama Foundation
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation

 

Related Stories

Cultural Facilities | Jul 13, 2017

A WWII bunker becomes a museum along Denmark’s coast

BIG’s design of this cultural center is the “antithesis” of the fortress.

Museums | Jul 5, 2017

Addition by subtraction: Art Share L.A. renovation strips away its acquired superfluity

The redesign of the 28,000-sf building is prioritizing flexibility, openness, and connectivity.

Performing Arts Centers | Jun 30, 2017

L.A.’s John Anson Ford Amphitheater might finally be ready for its close-up

The performing arts venue, nearly a century old, has undergone an extensive refurbishing.

Building Team | Jun 27, 2017

Bruner Foundation announces 2017 Rudy Bruner Award for Urban Excellence gold and silver medalists

The SteelStacks Arts and Cultural Campus in Bethlehem, Pa., receives the gold medal and $50,000.

Libraries | May 31, 2017

A year after its facelift, Boston’s Public Library is relevant again

Visitors are flocking to its brighter, connected halls, which now include retail and digital components. 

Cultural Facilities | May 25, 2017

The Shed, a multi-arts center on New York’s west side, moves forward in construction and funding

The facility, designed for maximum programming flexibility, includes a massive movable shell. 

Cultural Facilities | May 4, 2017

Obama Foundation reveals first look at the Obama Presidential Center

The design comprises three buildings set in the public space of Jackson Park on Chicago’s South Side.

Performing Arts Centers | Mar 6, 2017

An oval defines the Frank Gehry-designed Pierre Boulez Saal concert hall

The hall hosted its debut concert on Saturday, March 4 with a performance by the Boulez Ensemble.

Cultural Facilities | Mar 2, 2017

The Hanoi Lotus Centre will bloom from the middle of a lake

The building will act as a symbol of growth and prosperity for the city of Hanoi.

Cultural Facilities | Jan 30, 2017

Former windmill factory proposed as new ‘vibrant culture house’

The transformed building would provide space for street sports, street culture, and street art.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021