flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multipurpose sports facility will be first completed building at Obama Presidential Center

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

Located in Chicago’s Jackson Park, the 45,000-sf multipurpose sports facility and events space features a regulation-size NBA basketball court. The facility’s design is inspired by two of President Obama’s passions: basketball and community building.


By Novid Parsi, Contributing Editor  | April 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
Rendering: Obama Foundation

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. 

Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan. Elevate Design Builders, a joint firm led by Bowa Construction and AECOM Hunt, is the builder.

The Home Court features a regulation-size NBA basketball court with intersecting practice courts, flexible seating, fitness equipment, and training spaces. A mezzanine level provides additional seating for an intimate spectator experience. Home Court also offers multipurpose spaces for community activities.

The Home Court’s design is inspired by two of President Obama’s passions: basketball and community building. The sleek metal and glass panel exterior has been patterned to evoke a basketball net and community connection. The expansive, east-facing glass façade—fritted to protect birds by keeping them from striking it—will offer views of the campus.

“From the outset, President Obama knew he wanted our Home Court to be a place where people could come for fun, inspiration, and learning—the kind of community spaces we need in an inclusive democracy,” Obama Foundation CEO Valerie Jarrett said in a statement. “We intend for it to be an extraordinary resource to our community that will allow families to improve their health and wellness, and participate in educational and career readiness programming all in hopes of building a brighter, healthier future.”  

The design aligns with the Obama Foundation’s sustainability goals for the campus. The two-story lobby will provide natural light for many of the building’s interior spaces. Like the rest of the campus, the Home Court will be heated and cooled mostly with geothermal energy, part of the campus-wide strategy to avoid using fossil fuels.

Rendering: Obama Foundation
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation

 

Related Stories

Cultural Facilities | Apr 1, 2021

A Connecticut firm deploys design to assist underserved people and communities

Hartford, Conn.-based JCJ Architecture traces its roots to 1936, when the U.S. was just coming out of an economic depression and its unemployment rate was still 14%. In 2021, with the country trying to recover economically from the impact of the coronavirus, and with questions about social inequity entering the public debate as rarely before, JCJ has focused its design work on projects and clients that are committed to social responsibility and advocacy, particularly for underserved or marginalized communities.

Cultural Facilities | Mar 1, 2021

Moise Safra Center completes in New York City

The project will act as a second home for the Jewish community it serves.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

AECOM, Arup, and Populous head BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Government Buildings | Nov 13, 2020

Tax shortfalls nip government projects in the bud

Federal contracts are proceeding, but states and cities are delaying, deferring, and looking for private investment.

Cultural Facilities | Oct 13, 2020

Thailand’s Elephant Museum reinforces the bond between humans and beasts

The complex, in Surin Province, was built with 480,000 clay bricks.

Libraries | Sep 25, 2020

Major renovation to Providence’s downtown library is completed

The $29 million project adds light and collaborative space to a 67-year-old wing.

Cultural Facilities | Sep 24, 2020

America's 11 most endangered historic places - 2020 list

Annually, this list spotlights important examples of our nation’s architectural and cultural heritage that, without applied action and immediate advocacy, will be destroyed or face irreparable damage.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021