flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use pieces supporting a master plan in North Carolina fall into place

Mixed-Use

Mixed-use pieces supporting a master plan in North Carolina fall into place

Near Chatham Park, a new multifamily housing community follows the opening of a shopping center.


By John Caulfield, Senior Editor | October 5, 2023
An aerial view of Northwood Landing in North Carolina
An aerial view of Northwood Landing in North Carolina, a mixed-used development adjacent to the Chatham Park master-planned community. Images; Courtesy of Lee Moore Capiral

On September 7, Carolina Commercial Contractors, in collaboration with Lee Moore Capital Company, broke ground  on Medley Northwood Landing, a 312-unit garden apartment community in Pittsboro, N.C.

The 92-acre Northwood Landing is also home to a 62,000-sf shopping center anchored by a 44,000-sf Lowes Foods supermarket. The shopping center, which opened last June, has 10 outparcels for commercial and retail use, five of which have been leased by tenants that include national brands Dunkin’ and Zaxby’s.

Northwood Landing is across U.S. 501 from MOSAIC, a 44-acre $180 million entertainment and lifestyle destination that is also a gateway to the 8,500-acre Chatham Park master-planned community that is slated to have 22,000 homes and 22 million sf of constructed space. Chatham Park, which began construction in 2014 with the UNC Medical office building, is projected to be completed by 2040. (Preston Development Company, Chatham Park’s developer, also controls 1,000 adjacent acres that could be used for future expansion.)

A 62,000-sf retail center that's part of Northwood Landing
A shopping center in the heart of Northwood Landing is anchored by a Lowes Food supermarket.

Currently, Chatham Park has homes for sale in MOSAIC (condos and apartments), and in Vineyards, where 11 single-family and townhome builders are actively selling houses. A third community under development, called Encore, will be Chatham Park’s first active-adult-targeted neighborhood.

Combined with Northwood Landing, MOSAIC, and Penguin Place (another three-building 14,000-sf retail and restaurant space that debuted in 2017), Chatham Park will have 2 million sf of commercial area.

A growing market in need of housing

Two 36-apartment buildings at Medley are under construction and scheduled for completion by next spring. When Medley is built out, it will include 112 one-bedroom, 165 two-bedroom, and 36 three-bedroom apartments. Among its amenities are include garage parking, a pool pavilion with sundeck, a fitness center, golf simulator, and onsite staff and maintenance.
 

The site at Northwood Landing where Medley's garden apartments are being built. In the top left of the photo is visible multifamily housing available for rental at MOSAIC. Below, a rendering of what Medley Northwood Landing's multifamily homes will look like.

a rendering of Medley Northwood Landing

Along with Carolina Commercial Contractors, the Building Team for Medley has included CE Group (civil engineering), Sanford Contractors (horizontal construction), and Finley Design PA. Medley is being built in Chatham County, near the Raleigh-Durham metroplex, one of the fastest-growing counties in North Carolina. 

Of the 10 outparcels at Northwood Landing, three have been sold and are under development: Lot 5 (a 2,100-sf Dunkin’, a 4,849-sf First Health clinic, and 2,750-sf Haw River Veterinarian animal hospital); Lot 4 (a 3,162- ft, 72-seat Zaxby’s casual restaurant); and Lot 9 (Huby’s Car Wash).  Lot 3 also has a letter of intent to lease from Chase Bank, and a private school reportedly is considering renting one of the other lots. Several national retailers, quick-service restaurants, and service providers are looking at the balance of the sites.

Tags

Related Stories

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Apr 30, 2013

First look: North America's tallest wooden building

The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.

| Mar 3, 2013

Hines acquires Archstone's interest in $700 million CityCenterDC project

The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021