On September 7, Carolina Commercial Contractors, in collaboration with Lee Moore Capital Company, broke ground on Medley Northwood Landing, a 312-unit garden apartment community in Pittsboro, N.C.
The 92-acre Northwood Landing is also home to a 62,000-sf shopping center anchored by a 44,000-sf Lowes Foods supermarket. The shopping center, which opened last June, has 10 outparcels for commercial and retail use, five of which have been leased by tenants that include national brands Dunkin’ and Zaxby’s.
Northwood Landing is across U.S. 501 from MOSAIC, a 44-acre $180 million entertainment and lifestyle destination that is also a gateway to the 8,500-acre Chatham Park master-planned community that is slated to have 22,000 homes and 22 million sf of constructed space. Chatham Park, which began construction in 2014 with the UNC Medical office building, is projected to be completed by 2040. (Preston Development Company, Chatham Park’s developer, also controls 1,000 adjacent acres that could be used for future expansion.)
![A 62,000-sf retail center that's part of Northwood Landing](/sites/default/files/inline-images/Lowes_Image.jpg)
Currently, Chatham Park has homes for sale in MOSAIC (condos and apartments), and in Vineyards, where 11 single-family and townhome builders are actively selling houses. A third community under development, called Encore, will be Chatham Park’s first active-adult-targeted neighborhood.
Combined with Northwood Landing, MOSAIC, and Penguin Place (another three-building 14,000-sf retail and restaurant space that debuted in 2017), Chatham Park will have 2 million sf of commercial area.
A growing market in need of housing
Two 36-apartment buildings at Medley are under construction and scheduled for completion by next spring. When Medley is built out, it will include 112 one-bedroom, 165 two-bedroom, and 36 three-bedroom apartments. Among its amenities are include garage parking, a pool pavilion with sundeck, a fitness center, golf simulator, and onsite staff and maintenance.
![](/sites/default/files/inline-images/Precon%20Medley.jpg)
Along with Carolina Commercial Contractors, the Building Team for Medley has included CE Group (civil engineering), Sanford Contractors (horizontal construction), and Finley Design PA. Medley is being built in Chatham County, near the Raleigh-Durham metroplex, one of the fastest-growing counties in North Carolina.
Of the 10 outparcels at Northwood Landing, three have been sold and are under development: Lot 5 (a 2,100-sf Dunkin’, a 4,849-sf First Health clinic, and 2,750-sf Haw River Veterinarian animal hospital); Lot 4 (a 3,162- ft, 72-seat Zaxby’s casual restaurant); and Lot 9 (Huby’s Car Wash). Lot 3 also has a letter of intent to lease from Chase Bank, and a private school reportedly is considering renting one of the other lots. Several national retailers, quick-service restaurants, and service providers are looking at the balance of the sites.
Related Stories
Hotel Facilities | Apr 13, 2015
Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility
Just three miles away from the Olympic stadiums, the hotel will be a hub of its own.
Mixed-Use | Apr 7, 2015
$100 billion 'city from scratch' taking shape in Saudi Arabia
The new King Abdullah Economic City was conceived to diversify the kingdom's oil-dependent economy by focusing more in its shipping industry.
High-rise Construction | Mar 24, 2015
Timber high-rise residential complex will tower over Stockholm waterfront
The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.
Mixed-Use | Mar 13, 2015
Dubai announces mega waterfront development Aladdin City
Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.
High-rise Construction | Mar 11, 2015
Must see: Firm proposes skyscraper with a ‘twist’ in downtown Tulsa
Tulsa, Okla.-based architecture practice Kinslow, Keith & Todd released renderings of a skyscraper concept that takes the shape of a tornado.
Modular Building | Mar 10, 2015
Must see: 57-story modular skyscraper was completed in 19 days
After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”
Transit Facilities | Mar 4, 2015
5+design looks to mountains for Chinese transport hub design
The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.
Sponsored | | Mar 3, 2015
New York’s Fulton Center relies on TGP for light-flooded, underground transit hub
Fire-rated curtain wall systems filled this subterranean hub with natural light.
Sponsored | Shopping Centers | Feb 26, 2015
A color-changing gateway for Altara Center
Valspar works with developers to complete a multicolored shopping center façade in Honduras.
Industrial Facilities | Feb 24, 2015
Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility
The $460 million Food Port project will define a new model for the relationship between consumer and producer.