flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development under construction in Detroit’s central business district

Mixed-Use

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.


By David Malone, Associate Editor | January 16, 2018
CBD Detroit exterior rendering

Rendering courtesy of City Club Apartments

In 2005, the historic 18-floor, 800-room Statler Hotel was torn down, leaving one of the most exclusive corners in downtown Detroit vacant. Now, over a decade later, a new mixed-use development has broken ground at the corner of Washington Boulevard and Park Avenue.

City Club Apartments — Central Business District (CBD) Detroit will include approximately 288 apartments and penthouses and 13,000 sf of street level space, which will feature a pet store, a restaurant, and a gourmet market. “City Club Apartments—CBD Detroit will combine the service and amenities of a five-star hotel with engaging and connected urban apartment living,” says Jonathan Holtzman, Chairman and CEO of City Club Apartments, in a release.

The new $70 million mixed-use community will feature amenities such as movie theaters, social programming, valet parking, 24/7 concierge services, an entertainment club room with a gourmet kitchen, and wellness and exercise rooms. An indoor/outdoor pool and hot tub will connect to a private park and a dog park will also be available to residents.

 

Outdoor court yard space included in CBA DetroitRendering courtesy City Club Apartments.

 

The residential units will feature exclusively manufactured cabinetry and fixtures. Additionally, advanced and high-speed fiber technologies will be incorporated into the buildings.

20% of the apartments will be affordable. Furnished short-term rentals will also be offered. The apartments and penthouses come in four distinct finish packages and are available in studio, convertible, one-bedroom, and two-bedroom units.

The project is the first ground-up, mixed-use, conventionally financed high-rise to be built in Detroit’s central business district in 30 years. Pre-leasing will begin in summer 2018 with occupancy slated to begin in winter 2018. The Building Team includes BKV Group (architect), Damon Farber (landscape architect), and Wolverine Building Group (contractor).

Related Stories

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

Mixed-Use | Mar 27, 2017

The Plant brings terrace-to-table living to Toronto

Curated Properties and Windmill Developments have teamed up to create a mixed-use building with food as the crux of the project.

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021