flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development under construction in Detroit’s central business district

Mixed-Use

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.


By David Malone, Associate Editor | January 16, 2018
CBD Detroit exterior rendering

Rendering courtesy of City Club Apartments

In 2005, the historic 18-floor, 800-room Statler Hotel was torn down, leaving one of the most exclusive corners in downtown Detroit vacant. Now, over a decade later, a new mixed-use development has broken ground at the corner of Washington Boulevard and Park Avenue.

City Club Apartments — Central Business District (CBD) Detroit will include approximately 288 apartments and penthouses and 13,000 sf of street level space, which will feature a pet store, a restaurant, and a gourmet market. “City Club Apartments—CBD Detroit will combine the service and amenities of a five-star hotel with engaging and connected urban apartment living,” says Jonathan Holtzman, Chairman and CEO of City Club Apartments, in a release.

The new $70 million mixed-use community will feature amenities such as movie theaters, social programming, valet parking, 24/7 concierge services, an entertainment club room with a gourmet kitchen, and wellness and exercise rooms. An indoor/outdoor pool and hot tub will connect to a private park and a dog park will also be available to residents.

 

Outdoor court yard space included in CBA DetroitRendering courtesy City Club Apartments.

 

The residential units will feature exclusively manufactured cabinetry and fixtures. Additionally, advanced and high-speed fiber technologies will be incorporated into the buildings.

20% of the apartments will be affordable. Furnished short-term rentals will also be offered. The apartments and penthouses come in four distinct finish packages and are available in studio, convertible, one-bedroom, and two-bedroom units.

The project is the first ground-up, mixed-use, conventionally financed high-rise to be built in Detroit’s central business district in 30 years. Pre-leasing will begin in summer 2018 with occupancy slated to begin in winter 2018. The Building Team includes BKV Group (architect), Damon Farber (landscape architect), and Wolverine Building Group (contractor).

Related Stories

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

Mixed-Use | Feb 7, 2017

Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca

The Foster + Partners-designed building will address the shortage of accommodation in Mecca.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Mixed-Use | Jan 26, 2017

New renderings provide glimpse into large mixed-use project, Circa

The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018. 

Mixed-Use | Jan 18, 2017

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

The oft-delayed project was set to begin in 2007 but was halted due to the recession.

Mixed-Use | Dec 1, 2016

Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water

The Sluishuis employs a unique shape that makes it appear different from every vantage point.

Mixed-Use | Dec 1, 2016

Initial work on mixed-use development, The Parks at Walter Reed, is underway

The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021